05. Hales - Planning Report
Attached to the e-mail Operational Works Application OPW20/0117 - 37 Mossman Crt Noosa Heads.
PROJECT URBAN – 20153 13 Jul 2020
Performance Criteria Acceptable Solution Comments
Design, construction and safety – prescribed decks
way to ensure it is able to a) subject to paragraph (b), each of the
support its intended loads, following Australian Standards to the
having regard to its relevant extent requirements stated in the Standard
loading matters. apply to relevant loading matters for the
design or construction of the prescribed
deck:-
(i) AS/NZS 1170.0;
(ii) AS/NZS 1170.1;
(iii) AS/NZS 1170.2;
(iv) AS 4997;
b) if a relevant planning scheme standard
is more stringent than the standard in
paragraph (a) – the relevant planning
scheme standard, to the extent it is more
stringent than the standard in paragraph
(a).
15.3 Prescribed tidal work The design and construction of the Not applicable.
that is a prescribed deck do boardwalk or deck is consistent with the
not prevent or hinder following standards:- The proposal is not a
remedial work being a) subject to paragraph (b), a boardwalk or prescribed deck.
undertaken on any bank of independent deck either:-
tidal water or for any existing (i) can be easily dismantled and
retaining wall, revetment or reassembled; or
seawall or another existing (ii) does not restrict the movement of
structure. machinery ordinarily used for
remedial work to any bank of tidal
water or any existing retaining
wall, revetment or seawall or other
existing structure;
b) if a relevant planning scheme standard
is more stringent than the standard
mentioned in paragraph (a) – the relevant
planning scheme standard, to the extent it
is more stringent than the standard
mentioned in paragraph (a).
Performance Criteria Acceptable Solution Comments
Design, construction and safety – jetties and piers
16.1 Prescribed tidal works (s 5(2) outcome) Compliant.
that are a jetty or pier are The design and construction of the jetty or
designed and constructed in a pier is consistent with the following The proposed jetty has been
way to ensure it is able to standards:- engineered for this purpose
support its intended loads, a) subject to paragraph (b), each of the and the relevant loads are
having regard to its relevant following Australian Standards to the reflected on the plans.
loading matters. extent requirements stated in the
Standard apply to relevant loading
Development Assessment Report Page 28 of 42
Operational Works
37 Mossman Court, Noosa Heads 4567
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.