05. Hales - Planning Report
Attached to the e-mail Operational Works Application OPW20/0117 - 37 Mossman Crt Noosa Heads.
PROJECT URBAN – 20153 13 Jul 2020
Performance Criteria Acceptable Solution Comments
Design, construction and safety – jetties and piers
the extent it is more stringent than the
standard mentioned in paragraph (a).
Performance Criteria Acceptable Solution Comments
Design, construction and safety – pipelines and other underground services
17.1 The design and (s 5(2) outcome) Not applicable.
construction of prescribed The design and construction of the
tidal works that are a pipeline, pipeline or underground service is The proposal is not a pipeline
or another underground consistent with the following standards:- or another underground
service ensures vessels a) subject to paragraph (b):- service.
anchoring near the works (i) for a pipeline that is gas or
cannot interfere with, or liquid petroleum pipeline –
damage, the works. AS/NZS 2885 to the extent
requirements stated in the
Standard apply to the design
or construction of the pipeline;
or
(ii) for another pipeline or other
underground service – the
pipeline or service is installed
at least 1.2m below the surface
of land, after it is installed;
b) if a relevant planning scheme standard
is more stringent than the standard
mentioned in paragraph (a) – the
relevant planning scheme standard, to
the extent it is more stringent than the
standard mentioned in paragraph (a).
Performance Criteria Acceptable Solution Comments
Design, construction and safety – pontoons
18.1 Prescribed tidal works (s 5(2) outcome) Not applicable.
that are a pontoon and not
used only for rowing, are The design and construction of the The structure is not a pontoon.
designed and constructed in a pontoon is consistent with the following
way to ensure it is able to standards:-
support its intended loads, a) subject to paragraph (b), each of the
having regard to its relevant following Australian Standards to the
loading matters. extent requirements stated in the
Standard apply to relevant loading
matters for the design or construction
of the jetty or pier:-
(i) AS/NZS 1170.0;
(ii) AS/NZS 1170.1;
(iii) AS/NZS 1170.2;
(iv) AS1170.4
Development Assessment Report Page 30 of 42
Operational Works
37 Mossman Court, Noosa Heads 4567
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.