05. Hales - Planning Report

Attached to the e-mail Operational Works Application OPW20/0117 - 37 Mossman Crt Noosa Heads.

of 43

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

PROJECT URBAN – 20153                                                                               13 Jul 2020


Performance Criteria            Acceptable Solution                               Comments
Design, construction and safety – pontoons
                                             (v) AS 3962
                                             (vi) AS 4997;
                                b) if a relevant planning scheme standard
                                    is more stringent than the standard
                                    mentioned in paragraph (a)– the
                                    relevant planning scheme standard, to
                                    the extent it is more stringent than the
                                    standard mentioned in paragraph (a).
18.2 Prescribed tidal works (s 5(2) outcome)                                      Not applicable.
that are a pontoon and used The design and construction of the
only for rowing, are designed pontoon is consistent with the following            The proposed structure is not a
and constructed in a way to standards:-                                           pontoon.
ensure:-                        (a) subject to paragraph (b):-
(a) the pontoon is able to          (i)      for a pontoon constructed
support its intended loads,                  within a marina – AS 3962 to
having regard to its relevant                the     extend     requirements
loading matters; and                         stated in the Standard apply to
 (b) the pontoon is safe for                 relevant loading matters for
persons using the pontoon to                 the design or construction of
launch and retrieve rowing                   the pontoon; or
vessels.                            (ii)     for a pontoon not constructed
                                             within a marina:-
                                         (A) the access walkway of a
                                             pontoon used only for rowing
                                             is able to support at least a live
                                             load of 3.0kPa; and
                                         (B) the flotation unit of a pontoon
                                             used only for rowing is able to
                                             support at least a live load of
                                             1.5kPa; and
                                         (C) at least 75mm of the height of
                                             the pontoon’s flotation unit
                                             will remain above the surface
                                             of the water over which it is
                                             constructed if a distributed live
                                             load is applied to half of the
                                             surface of the pontoon’s
                                             flotation unit and all of the
                                             surface of the pontoon’s
                                             access walkway;
                                b) if a relevant planning scheme standard
                                    is more stringent than the standard
                                    mentioned in paragraph (a) – the
                                    relevant planning scheme standard, to
                                    the extent it is more stringent than the
                                    standard mentioned in paragraph (a).

Development Assessment Report                                                                        Page 31 of 42
Operational Works
37 Mossman Court, Noosa Heads 4567
Log in to download the original file

05. Hales - Planning Report.pdf · 2.3 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.