Original source · versioned page text
05. Hales - Planning Report
Attached to the e-mail Operational Works Application OPW20/0117 - 37 Mossman Crt Noosa Heads.
PROJECT URBAN – 20153 13 Jul 2020
Performance Criteria Acceptable Solution Comments
Design, construction and safety – revetments and seawalls
(v) AS 4997;
b) subject to paragraph (c), AS 4678 to
the extent requirements stated in the
Standard apply to earth-retaining
structures;
c) if a relevant planning scheme standard
is more stringent than the standard
mentioned in paragraph (a) – the
relevant planning scheme standard, to
the extent it is more stringent than the
standard mentioned in paragraph (a).
19.2 Prescribed tidal work (s 5(2) outcome) Compliant.
that is a revetment or seawall, The design and construction of the
is designed and constructed revetment or seawall is consistent with the The engineer’s certificate
in a way to ensure it can following standards:- attached to the application
withstand:- (a) subject to paragraph (d), a revetment confirms the design is in
a) any tendency of or seawall is able to withstand the accordance with the relevant
overturning or sliding; and effect of waves, or a combination of standards.
b) any other effects of waves waves and water levels, resulting from
or changes in water levels on a storm event with an AEP of 2%,
the revetment or seawall. factoring in projected sea level rise;
(b) subject to paragraph (d), each of the
following Australian Standards to the
extent requirements stated in the
Standard apply to relevant loading
matters for the design or construction
of the revetment or seawall:-
(i) AS/NZS 1170.0;
(ii) AS/NZS 1170.1;
(iii) AS/NZS 1170.2;
(iv) AS1170.4
(iii) AS 4997;
d) subject to paragraph (d), AS 4678 to
the extent requirements stated in the
Standard apply to earth-retaining
structures;
e) if a relevant planning scheme standard
is more stringent than the standard in
paragraph (a), (b) or (c) – the relevant
planning scheme standard, to the
extent it is more stringent than the
standard in paragraph (a), (b) or (c).
19.3 Prescribed tidal works (s 5(2) outcome) Compliant
that are a revetment or The design and construction of the
seawall is designed and revetment or seawall is consistent with the The engineered plans and
constructed to protect the following standards:- certificate ensure the proposal
revetment or seawall from
Development Assessment Report Page 35 of 42
Operational Works
37 Mossman Court, Noosa Heads 4567
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.