Original source · versioned page text
05. Hales - Planning Report
Attached to the e-mail Operational Works Application OPW20/0117 - 37 Mossman Crt Noosa Heads.
PROJECT URBAN – 20153 13 Jul 2020
O3. Prescribed tidal works are not No solution provided. Compliant.
located on the southern bank of The proposed works are
the Noosa River and tributaries located outside of these areas.
between the Noosa Heads Lions
Park and Weyba Bridge.
O4. Prescribed tidal work does Compliant.
not include extensions of on-site The proposed works do not
recreational areas unless there is include works of this nature.
a clear demonstrated public
benefit and public support.
14.164 Character and Amenity
O5. Prescribed tidal works are S5.1 For lots with frontages greater Compliant with S5.1.
designed and sited to ensure:- than 15m or greater in width, jetties The proposed jetty is setback
a) they are contained within the and pontoons are setback a minimum 3m from the prolongation of
prolongation of boundaries of of 3m from the prolongation of the the side boundary.
the lot; boundaries, except as allowed for in
b) that when a vessel is berthed it S5.2 and S5.3. The one proposed vessel is
does not encroach over the OR suitably sized for the jetty
prolongation of boundaries of S5.2 For lots less than 15m in width structure and will not encroach
the lot; (including lots located in canal bends or over the prolongation of the
c) a high level of visual amenity is on lots located in the head of the boundaries of the lot.
maintained when viewed from canal):-
the watercourse and adjoining a)a joint application is made with the The jetty deck is designed to
lands; adjoining owner; or keep a low profile to ensure
d) they avoid conflicts with uses b)where a joint application is not visual amenity is maintained.
in the water and on the foreshore possible, jetties and pontoons:-
and adjoining lands; i) Are setback a minimum of The jetty will replace an existing
e) cluttering of watercourses is 1m from the prolongation of approved jetty to cluttering of
avoided; the boundaries; the watercourse is avoided.
f) excessive traffic volumes within ii) Are not more than 1.2m in
foreshore areas and adjoining width; and The proposed jetty materials
lands are avoided; iii) Have no head and are are typical for this type of
g) materials blend with the located such that when a structure and similar to other
natural surrounds; and vessel is berthed, it does not structures in the immediate
h) they reflect the character and encroach over the area.
setting of the immediate prolongation of a boundary;
surrounds or the locality. AND
S5.3 For lots that adjoin those S5.2 & S5.3 – Not applicable.
described in S5.2, a jetty or pontoon is
locat5ed well away from the common
boundary. Compliant.
The proposed jetty will not be
O6. Jetties and wharves are not S6.1 No solution provided. roofed.
roofed.
Compliant.
There is no boat lifting device
S7.1 No solution provided. proposed as part of the works.
Development Assessment Report Page 38 of 42
Operational Works
37 Mossman Court, Noosa Heads 4567
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.