Minor Change Existing Approval MCU18/0009.05 [As Published]
CD-304 03 Landscape Materials and Finishes – Sheet 4 by 15.11.2024
Project Urban
CD-404 05 Landscape Planting Plan – Sheet 4 by Project Urban 15.11.2024
2. The development must include the following, to the reasonable satisfaction of the Manager,
Development Assessment:
2.1. Deleted
2.2. Car parking must be provided at a rate of 0.92 car spaces per bed. Of these, 0.21
spaces per bed are for event days which must be accommodated on the site, but may
be located in temporary areas. The layout must comply with Australian Standard
AS/NZS 2890.1-2004 and may include the existing 18 car parking spaces in the
road reserve.
2.3. Deleted
2.4. Deleted
2.5. All buildings are to be setback a minimum of 6.0 metres to all boundaries apart from
the existing development. Landscaping of the setback is to be in accordance with the
approved plans with existing vegetation retained and reinforced in the setbacks to
maintain the amenity of adjoining residents and a visual screen to Cooroy Noosa
Road.
2.6. Noise attenuation measures must be incorporated into the building design to mitigate
traffic noise impacts from Cooroy Noosa Road. The design criteria for the development
must be 63dB(A)L10(18hours)
2.7. Deleted
3. The development must be undertaken and operated in a manner that causes no detrimental
effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
lighting nuisance or other emissions.
4. No vegetation removal is permitted within the Q100 flood line and east of the existing car
park footprint.
5. A parking management plan must be submitted detailing how car parking is to be managed
and to direct visitors on event days.
6. A maximum building height of 2 storeys and 9.30 metres for Villas 1 and 2 and 9.75 metres
for Villas 3 and 4 in accordance with the approved plans. The Entry Building must not exceed
2 storeys and 8.0 metres.
7. Security in the form of a cash bond or trading bank guarantee to the sum of $20,000 must
be submitted for each stage, to secure performance of all conditions of the relative stage
approval. This security must be submitted prior to the issue of a Development Permit for
Operational Works for the relevant stage. The cash bond or trading bank guarantee will be
returned on performance of the conditions of approval less any costs incurred by Council in
respect of enforcing performance of this permit.
8. The requirements of this development approval are to be effected, prior to the use of the
premises. Council reserves the right to call upon the bond or guaranteed sum referred to in
this approval to effect compliance with conditions.
Flooding
9. All buildings proposed on site must be constructed to a minimum floor level above the
predicted 1 in 500 ARI design storm (Q500) to avoid the risk of flooding.
Vehicle Access
10. All vehicles must enter and leave the site in a forward direction.
Page 3 of 12
Document Set ID: 23418169
Version: 2, Version Date: 20/12/2024