Minor Change Existing Approval MCU18/0009.05 [As Published]
11. Bollards must be installed to the western end of the existing road reserve car park to contain
vehicles within the car park.
Carparking
12. All car parking spaces must be designed and constructed in accordance with AS/NZS
2890.1:2004 (User Class 1 for staff and employees and User Class 3 for visitors) with
allowance for vehicles to enter and leave the site in a forward gear and with a minimum head
clearance (headroom) at any point of 2.2m.
13. All car parking spaces for persons with disabilities must be designed and constructed in
accordance with AS /NZS 2890.6:2009.
14. All carparking must be kept, maintained and line-marked in a condition fit for use.
15. All staff carpark spaces must be clearly defined by line marking each space with the words
“Staff Parking Only” and by sign posting each space with a similar wording.
16. A dedicated pedestrian pathway must be provided linking the proposed carparking area and
the proposed Admin Block. The pathway must:
a. Be a minimum of 1.5m wide,
b. Be located clear of the access driveway, and
c. Include a marked pedestrian crossing point to the Admin Block
Earthworks
17. A suitably qualified Registered Professional Engineer must prepare engineering drawings
and specifications for all engineering works that will become Council infrastructure, which
must be submitted in conjunction with an application for a Development Permit for
Operational Works. In this regard a DXF/DWG file on GDA94 zone 56 grid of the proposed
cadastre layout is to be submitted in conjunction with any application for Operational Works.
General
18. Digital detailed designs including drawings, calculations, specifications and a schedule of
works, must be submitted with any application for a Development Permit for Operational
Works in respect of roadworks and stormwater drainage works. The design must be in
accordance with Council’s Planning Scheme Policy PSP05 – Engineering Design Standards
19. Roads, Drainage and Earthworks. To avoid conflict with underground pipes or services, all
existing and proposed services required by the development must be shown on the plans.
20. To facilitate production of As Constructed drawings it is suggested that all design drawings
are submitted in the Asset Design and As Constructed (ADAC) digital format. (Guidelines on
the use of ADAC are available at www.adac.com.au).
21. A construction management plan/strategy to ensure no damage occurs to Council services
must be prepared by a suitably qualified Registered Professional Engineer and submitted to
Council in conjunction with any application for Operational Works.
22. Any damage caused to any public utility during the course of construction must be repaired
to Council’s standards and at no cost to Council.
23. Any alteration of any public utility or other facilities necessitated by the development of the
land or associated construction works external to the site must be at no cost to Council.
24. The transportation of all materials to and from the site must be undertaken in a manner such
that no particle matter escapes onto a public road. All vehicles carrying materials either to or
from the site must be covered to prevent materials including dust being windblown from the
vehicle.
25. As Constructed drawings and data must be certified by a qualified experienced Civil Engineer
for design intent, and a Licensed Surveyor must certify the cadastre and the location, level
and type of all services and structures. All of which must be submitted to Council for checking
and for Council’s records.
Page 4 of 12
Document Set ID: 23418169
Version: 2, Version Date: 20/12/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original