Minor Change Existing Approval MCU18/0009.05 [As Published]

of 12

Page text shows just the words. Original shows the document exactly as it was published.

                      Sunset period for temporary staff accommodation
               55.    This development approval for 2 temporary accommodation units lapses on 21 October
                      2026, unless an application to extend the approval is approved by Council.
               56.    The 2 temporary accommodation units must be for the primary use of staff of the residential
                      care facility.
               57.    The 2 temporary staff accommodation units must be connected to the approved stormwater
                      water management system on site. An updated stormwater management plan incorporating
                      the units must be submitted to Council prior to the issue of a Building approval.
               5.     REFERRAL AGENCIES

               Not applicable
               6.     ADVISORY NOTES

               ADVISORY NOTES:
                      Building and Construction Industry (Portable Long Service Leave) Levy
               1.     The QLeave levy must be paid prior to the issue of a development permit where it is required.
                      Council will not be able to issue a Decision Notice without receipt of details that the Levy has
                      been paid. QLeave contact: 1800 803 481 (free call) or (07) 3212 6855.
                      Co-ordination of Operational Works Assessment
               2.     Additional application fees apply to Operational Work applications where the different
                      aspects of the works are lodged separately. Significant savings in application fees will result
                      if all works are lodged in a single application.
                      Preparation of a Preliminary Construction Management Plan
               3.     A preliminary Construction Management Plan must be submitted with the Operational Works
                      application and must address the following:
                      a.      traffic management during all aspects of the construction phase including:
                              i.       a Traffic Management Control Plan in accordance with the Manual of Uniform
                                       Traffic Control Devices (MUTCD) detailing all temporary signage and traffic
                                       control measures prior to construction
                              ii.      maintenance of safe pedestrian access for the areas affected by the works during
                                       and after daily construction has ceased
                              iii.     proposed fencing to the site during the construction phase of the development
                              iv.      approval of the Traffic Management Control Plan by the Department of Transport
                                       and Main Roads (DTMR) for any works on State controlled roads
                              v.       provision for worker car parking
                      b.      maintenance and protection of water quality and existing drainage lines through the
                              construction site, through the implementation of appropriate erosion and sediment
                              control measures
                      c.      works programme identifying key components of the works and their respective
                              durations
                      d.      establishment of a communication protocol with the general public, adjoining owners,
                              emergency services and local businesses to advise of agreed construction times,
                              impacts on traffic, services and other relevant issues
                      e.      identification of complaint management procedures including:
                              i.       contact details for the on-site manager
                              ii.      dispute resolution procedures



                                                                                                         Page 9 of 12
Document Set ID: 23418169
Version: 2, Version Date: 20/12/2024
Log in to download the original file

Minor Change Existing Approval MCU18_0009.05 [As Published].pdf · 181 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.