               42.    Refuse containers must be provided in accordance with the requirements of the
                      Environmental Protection (Interim Waste) Regulation 1996 and (Waste Management)
                      Regulation 2000, for the storage and collection of refuse.
               43.    Public bins must be provided to reduce littering. All bins provided must be for refuse and
                      recycling and be decanted into the bulk bins by the site operators.
                      Mechanical Equipment
               44.    Written certification is required from a suitably qualified person confirming that sound
                      pressure levels from all mechanical plant and equipment comply with the following:
                      a.      Air-conditioning and Refrigeration
                                 •     7am to 10pm: Maximum background + 5dB(A)
                                 •     10pm to 7am: Maximum background + 3dB(A)
                      b.      Pumps
                                 •     7am to 7pm: Maximum background + 5dB(A)
                                 •     7pm to 10pm: Maximum background + 3dB(A)
                                 •     10pm to 7am: No audible noise.
               45.    The certification must be submitted to Council, which certifies that operational noise from any
                      fixed plant and equipment complies with the requirements of this Decision Notice.
                      (Additional conditions 18 July 2019)
               46.    Privacy screening to the northern elevation as detailed on the approved plans must be
                      designed and maintained to ensure that there is no overlooking into the adjoining residential
                      properties.
               47.    All elements of the approved Integrated Stormwater Management Plan system must be
                      maintained in accordance with the Water by Design, Maintaining Vegetated Stormwater
                      Quality Treatment Assets or manufacturer’s maintenance protocol where appropriate.
               48.    Stormwater management measures must be maintained in accordance with this approval
                      and a contract by an appropriate company to undertake maintenance in accordance with this
                      approval for a minimum 10 years must be signed and provided to Council prior to the
                      commencement of use.
                      (Additional conditions 18 February 2021)
               49.    The car park in Lot 19 on RP162468 (4 Carramar Street) must only be used by staff.
               50.    No lighting is to be provided to the car park in Lot 19 on RP162468 (4 Carramar Street).
               51.    Access to the car park in Lot 19 on RP162468 (4 Carramar Street) must only be via the
                      existing access from Cooroy Noosa Road. In this regard a locked gate must be provided to
                      prevent vehicle access to/from Carramar Street.
               52.    To minimise potential noise impacts on adjacent residential areas, the western carpark in Lot
                      19 on RP162468 (4 Carramar Street) must not be used between the hours of 6:30pm and
                      6:30am unless otherwise approved in writing by Council. A fence and gate must be provided,
                      generally along the eastern boundary of the Lot, preventing access to the carpark between
                      these hours.
               53.    The existing fencing to the northern and western boundaries must be maintained, if the
                      fencing is replaced the minimum height of any new fencing must be 1.8 metres.
               54.    Screening vegetation must be planted along the western boundary in accordance with
                      Council’s Planning Scheme Policy PSP2 - Landscaping. The planted vegetation must have
                      a minimum pot size of 45 litres and consist of native, endemic species with a mature height
                      of not less than 2 metres and a maximum spacing of 2 metre centres




                                                                                                       Page 8 of 12
Document Set ID: 23418169
Version: 2, Version Date: 20/12/2024
Log in to download the original file

Minor Change Existing Approval MCU18_0009.05 [As Published].pdf · 181 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.