Original source · versioned page text
23-0262- ESC DRAWINGS REVB red
Original PDF page 7, section 1. The text section number identifies this passage in the reader.
LEGEND:
EXISTING CONTOURS
CLEAN WATER DRAIN
DIRTY WATER DIVERSION BERM
EMERGENCY SPILLWAY
LEVEL SPREADER
AUTO-DOSER
SEDIMENT FENCE INLET - RL 5.50
ENSURE NO FLOW ENTERS SIDE OF BASIN
FLOW DIRECTION
FLOW OR RAINFALL
DEWATERING BASIN FOREBAY ACTIVATED DOSER
TYPE D PONDING AREA
LEVEL SPREADER - RL 5.30
MAIN CELL
FLOOR OF BASIN - RL 4.30
DEWATERING
BASIN
2m WIDE SPILLWAY (MINIMUM) -
RL 5.10 REFER TO TYPICAL DETAIL
SB1
TYPE D
LINED DRAIN TO DISCHARGE
TO STORMWATER INLET
SB1
TYPE D
CLIENT PROJECT
0 5 COPYRIGHT C INTEGRAL CONSTRUCTION NOOSA HEALTH PRECINCT
TOPO GROUP PTY LTD
DRAWN DESIGNED DATE DRAWING TITLE
B UPDATES TO BASIN SIZE AND LOCATION TB 29/02/2024 250
SCALE 1: 500 THIS DOCUMENT MAY NOT BE COPIED OR PG TB 29/02/2024 EROSION AND SEDIMENT CONTROL PLAN
ISSUED FOR USE TRANSMITTED IN ANY FORM OR BY ANY
A ORIGINAL ISSUE KR 10/10/2023 MEANS IN PART OR IN WHOLE WITHOUT
RPEQ / SIGNATURE (IF REQUIRED) DEWATERING BASIN DETAILS
NORTH
A3 THE WRITTEN CONSENT OF TOPO GROUP PROJECT No DRAWING No REVISION
REVISION DESCRIPTION APPROVED BY DATE PTY LTD. CPESC 6,374 23-0262 D06 A
B
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.