Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

23-0262- ESC DRAWINGS REVB red

of 12

Page text shows just the words. Original shows the document exactly as it was published.

Original PDF page 7, section 1. The text section number identifies this passage in the reader.

LEGEND:
          EXISTING CONTOURS

          CLEAN WATER DRAIN

          DIRTY WATER DIVERSION BERM

          EMERGENCY SPILLWAY

          LEVEL SPREADER

          AUTO-DOSER

          SEDIMENT FENCE                                                                                                                                                                                                                                  INLET - RL 5.50
                                                                           ENSURE NO FLOW ENTERS SIDE OF BASIN
          FLOW DIRECTION
                                                                                                                                                                                                                                                          FLOW OR RAINFALL
          DEWATERING BASIN                                                                                                                                           FOREBAY                                                                              ACTIVATED DOSER

          TYPE D PONDING AREA
                                                                                                                                                                                                                                                          LEVEL SPREADER - RL 5.30


                                                                                                                                                                    MAIN CELL
                                                                                                                                                                                                                                                          FLOOR OF BASIN - RL 4.30
                                                                                                                                                                    DEWATERING
                                                                                                                                                                       BASIN
                                                                                                                                                                                                                                                          2m WIDE SPILLWAY (MINIMUM) -
                                                                                                                                                                                                                                                          RL 5.10 REFER TO TYPICAL DETAIL

                                                                                   SB1
                                                                                  TYPE D

                                                                                                                                                                                                                                                          LINED DRAIN TO DISCHARGE
                                                                                                                                                                                                                                                          TO STORMWATER INLET




                                                                                                                  SB1
                                                                                                                 TYPE D




                                                                                                                                                                                                           CLIENT                                                         PROJECT
                                                                                                                           0                   5                                 COPYRIGHT C                           INTEGRAL CONSTRUCTION                                                 NOOSA HEALTH PRECINCT
                                                                                                                                                                             TOPO GROUP PTY LTD
                                                                                                                                                                                                           DRAWN                   DESIGNED        DATE                   DRAWING TITLE
                              B       UPDATES TO BASIN SIZE AND LOCATION                   TB       29/02/2024                          250
                                                                                                                               SCALE 1: 500                           THIS DOCUMENT MAY NOT BE COPIED OR            PG                        TB    29/02/2024                         EROSION AND SEDIMENT CONTROL PLAN
                                                                                                                                                   ISSUED FOR USE     TRANSMITTED IN ANY FORM OR BY ANY
                              A       ORIGINAL ISSUE                                       KR       10/10/2023                                                        MEANS IN PART OR IN WHOLE WITHOUT
                                                                                                                                                                                                           RPEQ / SIGNATURE (IF REQUIRED)                                                   DEWATERING BASIN DETAILS
                                                                                                                          NORTH
                                                                                                                                              A3                      THE WRITTEN CONSENT OF TOPO GROUP                                                                   PROJECT No                DRAWING No         REVISION
                           REVISION   DESCRIPTION                                     APPROVED BY     DATE                                                                          PTY LTD.                                                                CPESC 6,374                23-0262                   D06        A
                                                                                                                                                                                                                                                                                                                            B
Log in to download the original file

23-0262- ESC DRAWINGS REVB red.pdf · 7.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.