Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

23-0262- ESC DRAWINGS REVB red

of 12

Page text shows just the words. Original shows the document exactly as it was published.

Original PDF page 8, section 1. The text section number identifies this passage in the reader.

TYPE D SEDIMENT BASIN CALCULATIONS                                                                                                                                  QLD SPP                               0.45m (min)                                            SEDIMENT STORAGE                                                                                                        APPROX. DIMENSIONS


                                                                                                                                                                              OF HEAVY                                                                                                                                                                                                                                                                TOTAL
                                                                                                          SETTLING                                                                                                                                                                                                                                   APPROX.                APPROX.                   APPROX.
                                                                                                                                  TO COMPLY WITH                    m3/HA TO EFER TABLE.                                                                               CLEAN OUT                                  APPROX. REQ                                                                                                  SETTLING
                      CATCH AREA                BATTERS                                                       DEPTH                                                          FILTER                                     SED STORAGE              RUSLE SOIL                                                                                         LENGTH AT               WIDTH AT                  DEPTH AT                                    VOLUME AT
BASIN ID                                                             L:W RATIO                                                      80% QLD SPP              ACHIEVE QLD SPP      VSET                                                                                 FREQUENCY              VSS                 SED STORAGE                                                                                                  VOLUME
                             (HA)               (1 IN X)                                                            DS                                                       OWRATE AND                                   OPTION?               LOSS (t/ha/yr)                                                                                      SPILLWAY                SPILLWAY                  SPILLWAY                                     SPILLWAY
                                                                                                                                   REQUIREMENT                REQUIREMENT EA BEHIND.                                                              CREST                (MONTHS)ARMOUR ROCK                         DEPTH (m)                                                                                                      (m 3)
                                                                                                                 (m)                                                                                                                                                          225 mm (min)                                                               (m)                      (m)                     (m)                                           (m 3)
                                                                                                                                                                                                                                                                              FOR HIGH
SB1                          0.63                    2                                        3                 1.00                       YES                           1200                       756                    RUSLE                        133                3                  17                           0                             53.6                     17.9                     1.0                    756                   773
NOTES:
1. SIZING FOR TRADITIONAL BASIN IS BASED ON 1200m³/HA STORAGE VOLUME FOR CALOUNDRA, AS DETERMINED FROM TABLE 2 OF COMPLYING WITH THE SPP - TECHNICAL NOTE FOR GOVERNMENT DEVELOPMENT ASSESSMENT AND COMPLIANCE OFFICERS (HEALTHY LAND AND WATER (2018))

DEWATERING BASIN SPILLWAY CALCULATIONS                                                                                                                                                           WEIR                                                                                                 CHUTE                                                                                                              DISSIPATER

                                                                                                                                                                                                                              MIN.                                                                                                                                  DEPTH                      MEAN
                   CATCH                                               TIME OF                                                                                SIDE SLOPE                                                                                      LONG.                            MANNING
                                                                                                                          FLOW - Q              BASE                             U/S WATER FREEBOAR                         HEIGHT               TOP                      ROCK SIZE - D50                                DESIGN              DEPTH OF                WITH               ROCK SIZE - WIDTH 1                            WIDTH 2         LENGTH
BASIN ID            AREA                 ARI             CARI               CONC                             IARI                                                    1                                                                                        SLOPE                                ROUGH
                                                                                                                                (m3/s)         WIDTH                              LEVEL (m)              D (m)            SPILLWAY WIDTH (m)                                    (mm)                                VEL (m/s)                FLOW (m)              F/BOARD                      D50                 (m)                    (m)                (m)
                    (HA)                                                    (MINS)                                                                                (1 in x)                                                                                    (m/m)                                 COEFF
                                                                                                                                                                                                                         TO TOB (m)                                                                                                                                     (m)                    (mm)

SB1                 0.63                 20              0.735                                10             204                 0.26                2               2                    0.17                0.3              0.47              3.87            0.5            131                 0.119                 1.19                      0.10                0.40                    100                  4.2                   4.4                2.1



DIVERSION BERM / DRAIN CALCULATIONS
                                                                                                                                                                                                                                                                                                                                                                                                           DEPTH
                       CATCH                                                                       TIME OF                                                        LONG.                                  SIDE SLOPE SIDE SLOPE                                                                      MANNING
                                                                                                                                          FLOW - Q                                         BASE                                                                                                                           MAX PERM DESIGN VEL DEPTH OF                                                         WITH            DRAIN TOP                  OK /
DRAIN ID                AREA                   ARI                CARI                             CONC                    IARI                  3
                                                                                                                                                                  SLOPE                                             1                    2                             LINING                        ROUGH
                                                                                                                                               (m /s)                                     WIDTH                                                                                                                            VEL (m/s)                       (m/s)                FLOW (m)                F/BOARD                WIDTH (m)               NOT OK
                         (HA)                                                                      (MINS)                                                         (m/m)                                        (1 in x)              (1 in x)                                                        COEFF
                                                                                                                                                                                                                                                                                                                                                                                                               (m)

DWB1                      0.5                   2                0.595                               10                    127                  0.10               0.015                     0                      2                    20                       Vital HR - L/m2                      0.02                      1.5                       0.86                        0.11                    0.26                    5.62                   OK
CWB1                      0.5                   2                0.595                               10                    127                  0.10               0.015                     0                      2                    20                       Vital HR - L/m2                      0.02                      1.5                       0.86                        0.11                    0.26                    5.62                   OK
DWD1                     0.63                   3                0.595                               10                    127                  0.13                0.01                     0                      2                    2                        Vital HR - L/m2                      0.02                      1.5                        1.13                       0.24                    0.39                    1.57                   OK



                                                                                                      MAIN CELL LENGTH



                     DRAIN INVERT MIN.                                                                                                         MANUAL TREATMENT OF CAPTURED
                     0.2m ABOVE                                                                    MAXIMUM                                     RUNOFF REQUIRED POST RAINFALL,
                     SPILLWAY CREST                                                                WATER                                       AFTER SEDIMENTATION HAS
                                                                                                                                                                                                 0.3m (MIN)             SPILLWAY CREST
                                                                                                   LEVEL                                       OCCURED NATURALLY WITHIN BASIN

                                                                                                                                                                                                                                HIGH FLOW
                                                                                                                                                                                                                                (OVER
                                                                                                                                                                                                                                SPILLWAY)
                                                 SETTLING ZONE DEPTH (DS)                                                                                                          DEPTH (DT )

                                                                                                                SEDIMENT STORAGE DEPTH (DSS)



                                                                                                                                                                                                                                                                                       GEOTEXTILE LINING TO
                                                                                                                                                                                                                                                                                      CONTINUE UNDER ROCK.                                                                                                                         300 mm THICK,
                                                                                                                                                                                                                                                                                                                                                                                                                                   300mm  THICK, DD50-150
                                                                                                                                                                                                                                                                                                                                                                                                                                                   50-150mm
                                                                        TYPE D SEDIMENT BASIN TYPICAL SECTION (nts)                                                                                                                                                                                                                                                                                                                ROCK PROTECTION
                                                                                                                                                                                                                                                                                                                                                                                                                                   ROCK  PROTECTIONWITH  WITH
                                                                                                                                                                                                                                                                                                                                                                                                                                   GEOTEXTILE UNDERLAY
                                                                                                                                                                                                                                                                                                                                                                                                                                   GEOTEXTILE  UNDERLAY.

                                                                                                                                                                                                                                                                                                              2                                                                                                                 1 IN
                                                                                                                                                                                                                                                                                                       1 IN                                                                                                                            2

                                                                                                                                                                                                                                                                                                                                                                 FILL
                                                                                                                                                                                                                          SPILLWAY AND
                                                                                                                                                                                                                          CHUTE TO BE
                                                                                                                                                                                                                          LINED AS
                                                                                                                                                                                                                          SPECIFIED


                                                                                                                                                                                                                                                                                                                                       SPILLWAY
                                                                                                                                                                                                                                                                                                                                  OPTION         TYPICAL
                                                                                                                                                                                                                                                                                                                                         2 SPILLWAY      SECTION
                                                                                                                                                                                                                                                                                                                                                    TYPICAL SECTION
                                                                            MAIN CELL WIDTH




                                                                                                                                                                                                                                                                                                                                        0.5m MIN.
                                                                                                                                                                                                                                                                                                                                                                                                                  LINE   WITHD50
                                                                                                                                                                                                                                                                                                                                                                                                                   LINE WITH  TWO    LAYERS OFF
                                                                                                                                                                                                                                                                                                                                                                                                                                 - 150mm
 INLET DRAIN (OR
           PIPE)
                                                                                                                                                                                                                                                                                                                                                                                                                  DROCK.  UNDERLAY WITH
                                                                                                                                                                                                                                                                                                                                                                                                                    50-150mm ROCK
                                                                                                             MAIN CELL LENGTH                                                                                                                                                                                                                                                                                      GEOTEXTILE WITH
                                                                                                                                                                                                                                                                                                                                                                                                                  PROTECTION




                                                                                                                                                                                                                                                                                                                                       0.5m
                                                                                                                                                                                                                                                                                                                                                                                                                  GEOTEXTILE UNDERLAY
                                                                                                                                                                                                                    FLOW DIRECTION


                                                                                                                                                                                                                                                                                                                   1:2
                                                                                                                                                                                                                                                                                                                                                                                X28m
                                                                                                                                                                                                                                                                                                                                                                                   m
                                                                                                                                                                                                                                                                                                                                                                                   m                                                       1:2




                                                                                                                                                                                                                                                                                                                                                                                                                                                           0.3m
                                                                                                                                                                                                                                                                                                                                                                                                                                                          0.3m
                                                                                                                                                                                                                                                                                                                                                      SPILLWAY TYPICAL SECTION
                                                                                              TYPE D SEDIMENT BASIN PLAN VIEW (nts)

                                                                                                                                                                                                                                                                                                                                   CLIENT                                                                      PROJECT
                                                                                                                                                                                                                                                                                                 COPYRIGHT C                                         INTEGRAL CONSTRUCTION                                                             NOOSA HEALTH PRECINCT
                                                                                                                                                                                                                                                                                             TOPO GROUP PTY LTD
                                                                                                                                                                                                                                                                                                                                   DRAWN                        DESIGNED                DATE                   DRAWING TITLE
                                         B      UPDATES TO BASIN SIZE AND LOCATION                                                                           TB              29/02/2024
                                                                                                                                                                                                                                                         ISSUED FOR USE
                                                                                                                                                                                                                                                                                      THIS DOCUMENT MAY NOT BE COPIED OR                            PG                     TB            29/02/2024                         EROSION AND SEDIMENT CONTROL PLAN
                                                                                                                                                                                                                                                                                      TRANSMITTED IN ANY FORM OR BY ANY
                                         A      ORIGINAL ISSUE                                                                                               KR              10/10/2023                                                                                               MEANS IN PART OR IN WHOLE WITHOUT
                                                                                                                                                                                                                                                                                                                                   RPEQ / SIGNATURE (IF REQUIRED)                                                           CALCULATIONS & TYPICAL BASIN DETAILS
                                                                                                                                                                                                                                A3                                                    THE WRITTEN CONSENT OF TOPO GROUP                                                                                        PROJECT No                        DRAWING No             REVISION
                                    REVISION    DESCRIPTION                                                                                              APPROVED BY           DATE                                                                                                                 PTY LTD.                                                                                     CPESC 6,374                23-0262                               D07        A
                                                                                                                                                                                                                                                                                                                                                                                                                                                                             B
Log in to download the original file

23-0262- ESC DRAWINGS REVB red.pdf · 7.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.