ENVIRONMENTAL PROTECTION
Performance Outcomes Acceptable Outcomes Response
PO12 AO12.1 Not applicable.
Road infrastructure is located Roads follow the edge of existing
and aligned so as to— disturbed areas, or alternatively, these
(a) minimise disturbance to works are co-located with other
native vegetation and/or services within a combined utility
corridor.
other habitat areas;
(b) protect and maintain wildlife
AO12.2
corridor movements and the
Low impact construction techniques
safety of native fauna; are used around areas of vegetation to
(c) provide for compensatory be retained to minimise interference
habitat establishment and with the vegetation.
maintenance;
(d) minimise changes to the AO12.3
hydrological regime, Roads avoid native vegetation and
including drainage patterns, provide appropriate fauna movement
corridors and protection measures.
run-off and water quality;
(e) avoid crossing
AO12.4
watercourses, drainage
Road infrastructure within or adjacent
lines and wetlands, but to native habitat incorporates fences
where such crossings are which allow for protected wildlife
unavoidable, disturbed movement and controls unrestricted
areas are reinstated and access of domestic cats and dogs.
revegetated on completion
of works; and AO12.5
(f) minimise bulk earthworks. Native vegetation is protected from
clearing or construction activities by—
(a) clearly marking vegetation to be
retained with flagging tape;
(b) installing protective fencing around
the dripline of vegetation; and
(c) ensuring stock piling, storage and
vehicle parking occur outside the
areas of vegetation to be retained.
AO12.6
Where clearance of habitat is
unavoidable, once the area disturbed
by the works is re-established,
replacement habitat is planted in
proximity of the works to create native
fauna habitat suitable for the area and
maintained for the life of the works.
PO13 AO13 Not applicable.
Road infrastructure is Road infrastructure is constructed in
constructed to minimise accordance with Council’s Planning
adverse environmental impacts, Scheme Policy PSP6 Engineering
including from run-off and Design Standards – Roads, drainage
erosion. and earthworks
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (E - Engineering Code Assessment.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.