EXTERNAL WORKS AND INFRASTRUCTURE


Performance Outcomes                Acceptable Outcomes                   Response

PO14                                AO14                                  Complies.
Development is provided with        Where not already existing, the
external works—                     following infrastructure              The proposal is for a new
(a) along the full extent of the    components are provided at the        driveway crossover in the place
    frontage of the site to an      frontage of the site—                 of the existing driveway
    appropriate standard having     (a) full width sealed road;           crossover to Margit Crescent.
    regard to the specified         (b) concrete kerb and channel
    function of the road; and            where appropriate;
provided beyond the site’s          (c) forming and grading to
frontage if required.                    footpaths;
                                    (d) vehicular kerb and footpath
                                         crossings;
                                    (e) a constructed bikeway;
                                    (f) a constructed footpath;
                                    (g) a constructed carriageway;
                                    (h) required alterations to
                                         public utility mains, services
                                         or installations;
                                    (i) construction of any required
                                         alterations to public utility
                                         mains, services or
                                         installations;
                                    (j) stormwater drainage works;
                                         and
                                    (k) installation of electrical
                                         conduits.
PO15                                No acceptable outcome                 Complies.
Any alterations or repairs to       provided
infrastructure as a result of the
development are made at no
cost to Council.
PO16                                No acceptable outcome                 Complies.
Road infrastructure is proven to    provided
be suitable for its use prior to
Council accepting the dedicated
asset.


STAGED DEVELOPMENT


Performance Outcomes                              Acceptable Outcomes          Response

PO17                                              No acceptable outcome        Not applicable.
Staged development is planned, designed           provided
and constructed to ensure that—                                                The scale of the
(a) each stage of the development can be                                       development does not
    constructed without interruption to                                        require staging.
    services and utilities provided to the
    previous stages;
(b) the infrastructure provided is capable of
    servicing the entire development; and
    the materials used are consistent
    throughout the development.

Log in to download the original (E - Engineering Code Assessment.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.