Original source · versioned page text
E - Engineering Code Assessment.pdf
HYDROLOGY AND WATERWAY STABILITY
Performance Outcomes Acceptable Outcomes Response
PO10 AO10 Complies.
Development prevents The development is designed to:
increased bed and bank (a) limit the peak 1 year ARI Pre and post developed
erosion and sedimentation in event discharge within the peak stormwater flow rates
receiving waterways by receiving waterway to the pre- were calculated for the 1-
avoiding changes in low rate, development peak 1 year Year ARI (63% AEP)
peak flow run-off and flow discharge; design storm, and it was
duration. (b) maximise pervious areas by found the flow rates to be
using pervious alternatives for comparable (18L/s). This is
otherwise impervious areas attributed to the small scale
wherever possible; of the development site,
(c) provide for capture and reuse and relatively high existing
of stormwater for non-potable fraction impervious of the
purposes for gardening, toilet existing property.
flushing, laundry and hot
water supply uses; Refer to the accompanying
(d) incorporate appropriate Stormwater Report for
detention features; and calculations.
(e) incorporate natural channel
design principles OR
PO11 AO11.1 Complies.
Water sensitive urban design The design and construction of a
principles are applied to natural channel or natural channel The scale and design of
achieve multifunctional design rehabilitation works are in
the development is
of waterways, wetlands and accordance with the Natural
drainage lines that provide for: Channel Design Guidelines consistent with the
(Brisbane City Council) having residential / medium
(a) stormwater conveyance
regard to local topography, density residential zoned
that uses natural channel
geology and geomorphology. surrounds. No external
design;
catchments are conveyed
(b) protection of landscape AO11.2 through the property.
features and ecological Landscape features, plant species
important areas including and habitat types used in
terrestrial and aquatic stormwater conveyance channels
habitat; are complementary to the local
context and natural waterways.
(c) aesthetic and passive
recreation values; AO11.3
(d) flood management and Bank and bed stability and
conveyance of external planting densities result in a stable
catchment stormwater channel over the long term and
through the development; minimal potential for pest plant
(e) landscaping that species.
incorporates local native
AO11.4
species; and bed and bank Water Sensitive Design measures
stability. are incorporated into the
development, as detailed in the
document Water Sensitive
Designs small improvements, new
ideas, concepts and sketch
designs for stormwater filtration
systems (Healthy Waterways
Water by Design).
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (E - Engineering Code Assessment.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.