PO9 No acceptable outcome provided Complies.
The potential for movement
Access to the site will be
from the site, of soils or
provided with a suitable
similar materials is
construction access grid in
minimised.
accordance with IPWEA
standards, for the purpose of
mitigating tracking of soils.
P10 No acceptable outcome provided Complies.
Vacant sites do not have an
The development of the site
adverse impact upon the
will be undertaken in a
amenity of the surrounding
manner that is suitable to
areas.
standard construction
practices, and kept tidy.
P11 AO11.1 Complies.
The demolition or removal All building materials containing
The existing building
of a building does not asbestos, including asbestos
structure is modern, and is
cause a health risk. cement sheeting or roofing and
unlikely to contain asbestos.
lagging, are removed from the
building prior to demolition or In the event materials
Editor's note— Council may relocation. containing asbestos are
require a report identifying encountered, they will be
AO11.2
any asbestos products and disposed of in accordance
All building materials containing
how they may be managed with industry best practice.
asbestos products are disposed of
to avoid health risks. in accordance with industry best
practice.
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (E - Engineering Code Assessment.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.