SAFETY AND PROTECTION OF INFRASTRUCTURE WHEN DEMOLICHSING OR REMOVING
BUILDINGS
Performance Outcomes Acceptable Outcomes Response
PO7 AO7.1 Complies.
Demolition, removal, Infrastructure including reticulated
relocation or associated water, sewerage, stormwater, and Demolition of any existing
works do not result in: electricity are protected from structures will be carried out
damage and made safe to the accordingly, such that
a) 'live' or 'active' standard required by the regulatory existing services /
infrastructure that may authority. infrastructure are
present risk to people appropriately disconnected /
using the site or AO7.2 relocated and or protected.
surrounding areas; or Infrastructure is disconnected,
capped or sealed including:
b) damage to
infrastructure or other a) electricity meters are removed
works and electrical wires
disconnected;
Editor's note— An approval
will be required from b) telephone lines are
Council's Building and disconnected; and
Plumbing Services for
decommissioning plumbing c) data cables are disconnected
apparatus including: and removed.
a) sanitary drains or
reticulated water AO7.3
supply; and A temporary crossing is provided to
b) septic tanks, holding protect road reserve infrastructure
tanks or on-site including kerb and channel.
treatment systems. AO7.4
Any damage to footpaths, street
plantings, natural vegetation, kerb
and channel, bridges or roadways
at the removal site, the new site or
between the sites is repaired or
reinstated to at least pre-existing
conditions.
PO8 AO8.1 Complies.
Waste materials are Waste materials are removed from
removed from the site to During construction waste
the site.
avoid causing unhealthy materials will be placed into
conditions including: AO8.2 skips bins and removed from
If a development permit has not the site accordingly.
a) potential fire hazard; been issued for the future use of the
site:
b) ponding of water; and
a) hard surfaced areas including
c) breeding of vermin.
concrete slabs are removed or
covered with a minimum of 300
millimetres of soil; and
b) disturbed areas are
revegetated.
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (E - Engineering Code Assessment.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.