CHANGES TO EXISITNG APPROVAL- Condition 114 Infrastructure Charges 2014_Final
Attached to the e-mail 132005.220.04 Request a Change Existing Approval.
12 November 2014
Mr Denis Wallace
Senior Development Planner
Noosa Council
PO Box 141
Tewantin Qld 4565
Dear Denis,
REQUEST TO CHANGE TO EXISTNG APPROVAL
RE: REQUEST TO CHANGE EXISITNG APPROVAL FOR DEVELOPMENT
PERMIT FOR RECONFIGURATION OF A LOT (22 VILLAGE INDUSTRY
LOTS A BALANCE LOT, DRAINAGE RESERVE AND PARK LOTS) –
COUNCIL REF. 2005/220 – LOTS 1 & 5 ON SP188234 (ORIGINALLY LOT
1 ON RP200519 AND LOT 5 ON SP148796) – 17 & 70 MARY RIVER
ROAD, COOROY
Further to our recent discussions and correspondence regarding proposed changes
to and existing approval, we now formally seek to Request to Change Existing
Approval 2005/220 - Condition No.114 Contributions Towards Council
Infrastructure to allow for the provision of staged payments of the contributions.
We also request a review of the Roadwork Contributions proportioned to this
development in Condition 114. The amount of the contribution is not seen to be fair
or reasonable and far exceeds previous contributions issued for other approvals, &
particularly in comparison to charges applicable under the current legislation. Also
the assessment appears to have been undertaken differently compared to the other
PSP network contributions & therefore it is requested the review & application of the
road contribution be applied on the same basis as per Advisory Note 1 of the
existing approval.
Condition No.114
1. Request changes to Condition No.114 to allow for the provision of staged
payments of the contributions.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 2 pages
Page 2
Requested Change to the Condition: That the contributions towards council infrastructure in Condition 114 include a provision for staged payments of the contributions in line with the approved staging of the development. The staging to be as per the approved plan: Stage 1 – Lots 6, 7, 8 & Balance Lot 5 Stage 2 – Lots 10-26, 100,101 & 102 & Balance Lot 5 Stage 3 – Lots 9, 27, 50 & Balance Lot 5 Reason for changes: Construction of Stage 1 of the development commenced in January 2013 and reached practical completion in June 2013. The final survey provides for the establishment of 3 lots for sale by Council. Prior to the survey plan being sealed for a development, payment of contributions towards Council infrastructure is required in accordance with the development approval conditions. The infrastructure contributions payable for the entire development is approximately $3,058,218 (subject to annual indexation). Currently upon sealing of the survey plan for stage 1 Council will be required to pay the total infrastructure charges for the whole development (i.e. stages 1-3 22 Lots). It would seem more reasonable that the payment of the contributions towards infrastructure be aligned with the completion of each stage of the development. 2. Request a review of Roadwork Contributions required in Condition No.114 Requested Change to the Condition: We request a review and amendment of the Roadworks Contributions proportion of the contributions towards Council Infrastructure.
Page 3
Reason for change:
A review the Roadworks Contribution as the amount of the contribution is not
seen to be fair or reasonable and far excessive of previous contributions
issued for other approvals, particularly in comparison to charges applicable
under the current legislation. It appears that the assessment has been
undertaken differently compared to the other PSP network contributions. It is
requested that the contributions are reviewed and application of the road
contribution be applied on the same basis as per Advisory Note 1 for other
Council owned networks i.e. to be based on 40% site cover = 18,844m2 Use
Area.
In accordance with the IDAS provisions of the Sustainable Planning Act 2009, we
hereby make an application to Noosa Council for a change to an existing
Development Approval.
Accompanying this application, we have enclosed the following supporting
information –
Application Form
Copies of latest Development Permit Decision Notices
Copy of approved plan
A credit card debit authority form for Council, State Assessment & Referral
Agency & Unity Water as payment of the prescribed fees
Should you require additional information to assist with assessment of this
application please contact me.
Yours faithfully,
Hayley Jamieson