Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
 

 

PROPOSED INDUSTRIAL DEVELOPMENT
LANDSCAPE - OPERATIONAL WORKS
LOT 252 ON SP104257

FOR

DEVCON CAPITAL 9PTY LTD

11 LEO ALLEY ROAD, NOOSAVILLE
Development Application No. TBC

 

2S Consulting Civil &
A

Structural Engineers

COVEY Project Management

ASSOCIATES PTY LTD

ABN 59 137 305 992 & Planning

 

PROJECT No. 192297 - FOR OPW ISSUE: C
PROJECT MANAGER: MARK CUMMING PH - 07 5443 7777
LANDSCAPE ARCHITECT: JASON COLLETT PH - 07 5443 7777

 

Sheet List Table
Sheet Number Sheet Title
L000 Cover Sheet
LOOT Extent of Works
L100 Landscape Plan
L101 Landscape Plan

 

 

 

 

 

 

L102 Landscape Buffer Plan
L200 Landscape Details
L201 Landscape Details

 

 

 

 

 

 

 

NEARMAP 2019

LOCALITY PLAN

N.T.S.

 

 

 
Log in to download the original file

Attachment 4 - Landscape OPW Plans.pdf · 1.7 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 6 pages

Page 2

 

UNIX S UNIT 6 UNIT 7 UNIT 8 UNIT 9

 

 

 

 

 

 

 

 

 

 

   

 

 

 

 

 

 

 

 

INTERNAL PLANTING
Install 2 selection of shrub
and groundcover species to
soften and screen built
form within the
development. 100ltr
advance stock trees are
to be planted utilising
subsurface soil cells to
provide a minimum soil
volume of 4m> per tree

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  
 
 
 
 

 

 

 

 

 

 

 

 

 

planting

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
 
 
 
 
 
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LEO ALLEY ROAD

 

 

 

 

ENTRANCE PLANTING
Install @ Hered mix of shrub and groundcover species
to screen the front fencing of the development. 100\tr
advance stock trees are to be planted to provide
canopy screening to development frontage

 

   
   

 

LANDSCAPE BUFFER PLANTING
install @ mix of shrub and groundcover
species within the 3m wide easement
areas, Install large tree species outside
of easement areas as per loactions
noted on plans.

Refer to Landscape Plan L102 for
planting extents and plant schedules.

8 5 §

E

—

SCALE 1:250 (A1)

PROJECT SCOPE

Landscape

Soil Test 1
Imported Top Soil to 100\tr trees (4m* per tree) 28m?
100mm Imported Top Soil to all turf areas (allowance) 9m?
300mm Imported Top Soil to all planting beds 55m?
100mm Imported Top Soil to buffer planting areas 50m?
Verge turf (allowance) 87m?
Temporary turf to biobasin floors 49m?
400mm depth organic mulch all planting areas 19m?
50mm depth straw mulch to Biobasin floors 25m?
Jute mesh to Biobasin floors 49m?
Coir mesh to biobasin batters 28m?
100mm depth mulch to buffer planting areas 50m?
Paver Type 1 - 400x400mm concrete pavers 8
100mm depth gravel mulch - surround to pavers 0.5m?
Trees 100ltr bags 7
200mm pots to planting areas (shrub species) 1h6
1hOmm pots to planting areas (groundcover species) 445
75mm tubes to Biobasin floors (macrophyte species) 201
75mm tubes to buffer planting areas 780
Edge Type 1 - as per detail 161m
Landscape and Biobasin Works Establishment and Maintenance Period

Establishment Period 3 months
Maintenance Period 9 months

It is the Contractors responsibility to ensure that landscaping works are maintained throughout the
maintenance period.
Vandalism or unforseen damage to landscapes may be quoted separately prior to ‘Off-Maintenance’

Other

Provide Arborist AS2303:2018- Tree Stock for Landscape Use certification for all trees
Provide soil amelioration certificate from qualified Agronomist

Provide AS4419 compliance certificate for all imported soil

Exclusions to Landscape Scope
Retaining Walls

Bulk shaping of earthworks & fill
Stormwater inlets/outlets to Bio-basin

SCOPE OF WORKS

Landscape works to include the following

* Site preliminaries
* Top soil soil test and analysis

* Excavation and drainage to planting areas
* Supply and install subsurface soil cells

© Topsoil supply and placement

© Turf supply and lay

* Bio basin - removal of sacrificial turf and install of macrophyte species
as per documentation

*  Containerised plant material - supply and installation
* Organic mulch - supply and installation

* 3 month establishment of landscape works

* 3 month establishment of biobasin

* 9 month maintenance of landscape works

* 9 month establishment and maintenance of bio basin

* Attendance at Council pre-start, On and Off-Maintenance meetings

Contractor shall take full account of documentation of Civil Engineering, Hydraulic and Electrical
Engineering Works.
SITE PRELIMINARIES

Contractor to confirm planting boundaries / extent of works / loading / handling areas etc prior to
commencement. Contractor to attend pre-start meeting with Superintendent and Council.

Subsurface soil cell system is subject to detail design - to be installed strictly under
supervision/guidance from Manufacturer.

Suggested Manufacturer: City Green Tel. 1300 066 949 Web. https://citygreen.com/

 

 

Check all dimensions before commencement of work.
Check Site boundary dimensions from the Title plans
Check Building Boundary clearances by set out.
Notwithstanding the information supplied on this drawing,
the location, depth and extent of underground or overhead!
services are to be confirmed and protected on site by the
contractor prior to commencement of works.

IT_IS THE RESPONSIBILITY OF THE CONTRACTOR
TO CONTACT THE RELEVANT AUTHORITIES TO
CONFIRM THE LOCATION OF ALL EXISTING SERVICES
PRIOR TO THE COMMENCEMENT OF EXCAVATION

 

 

 

 

 

 

‘Approved

 

 

Consulting Civil &

 

 

 

a

Structural Engineers | KEVIN COVEY BEng,CPEng,MIEAust,MSPEPNG,RPEQ—1823

 

CHRIS CAMP BEng(Hons),MIEAust,RPEQ—4944

 

 

Checked - JO
Design = JC Drown = JC
Seales = 1:250(A1) Date - ec 2019 fe

 

DESIGN AVENOWENTS — FOR APPROVAL [JC CcCOoOVves
DESIGN AVENOMENTS — FOR APPROVAL |v

Project Management] 424 pupoRTH AVENUE Ph (07) 5443 7777

 

19-12-19]

 

 

PO BOX 16 Fax (07) 5443 7577
MAROOCHYDORE QLD 4558

 

APPROVAL ISSUE me | ASSOCIATES PTY LTD & Planning

 

 

Document Stage — oPW sou Dak
Issue Date

ABN 59 137 305 992

 

 

Description By E-MAIL: [email protected]

 

Drawing title -

Extent of Works

COMPLEX

Project - PROPOSED INDUSTRIAL Site -

Project 192297 Sheet No. LO01

 

11 LEO ALLEY ROAD

Digital Ref : 1001 Extent of Works Issue: ©

 

LTD

 

Client - DEVCON CAPITAL 9 PTY

 

NOOSAVILLE

This Document is copyright and shall not be copied
without written approval, nor shall it be used except
for the Development and the Site Specifiec

 

 

 

 

 

e:\12dS\data\ 12DSERVER\192297_280\DWG

Covey \Landscape\OPW\LOOT Extent oF Works.dwg

Page 3

 

3 SYZ BE ——\
- 15m spacing \ EB

 

 

 

 

 

 

 

 

 

 

AUNT 16 UNIT 15

 

 

2 BAN rob

5 ALP cae

No tree planting within
services easement

  
  

Ay 10 JUN usi

 

AL 5 LOM hys
hk. - underplanting

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Nw]

 

 

 

 

ti ytl( fet fel pel) tijt +

 

 

PROPERTY BOUNDARY

 

 

 

 

 

 

  
 
 

 

 

   
 
   
 
   

 
 
 
 
 
 
 

Refer to Engineer's — = fe
Documentation for all be kt | l | ke | l | | | | 5 Bin storage
retaining wall details 3 | S - refer to Architect's documentation for
and specifications § E gate and wall details and specifications
Refer to Engineer's Documentation for all
retaining wall details and specifications
UNIT 2
3 ALP cae
— 1 CUP ana
I \\ = 1001tr
TAX FT
5 LOM SH JN 2 BAN rob
(underplanting) mos 2 BAE vir
3 ALP cae or 4
—
BS ]
3 ALP cae |
L
5 LOM SH
(underplanting) 30 LOM SH
(underplanting)
2 BAN rob
Indicative extent of soil cells to be installed below hardstand
eP| Ensure all road base has been removed (dashed red line)
from planting area - existing-subgrada To provide minimum 4m? soil volume per 100ltr tree planting
to be decompacted no less than 150mm Refer to L201 indicative detail - subject to final detail design.
depth prior to installing topsoil.
Refer to Civil Documentation for edge
thickening detail pertaining to building
UNIT 1 footing/slab.
3 Refer to Detail Plan A for
3 SYZ Pl 3 = landscape treatment f 18 LOM SH
~ 850mm spacing Z ;— 9 JUN usi [ It (underplanting)
3 5 LOM hys r “77-474 1 MEL qui
3 AUS dul “| | | | 7 - q
ro EN EHACE - underplanting 1 I ~ 100ltr
2-MEL qui | { l 3 ALP
~ 100ltr ‘N 3 XAN ful 2 AUS dul 3 LOM SH i cae
—) |
Install Coir mesh —+ : 3 BAN rob \ 5 = 1 BAN rob
to biobasin batters > 1 3 Wall Type 1 with letterboxes & signage plate
- 9m? = 5 MYO ell ly aan | - refer to Engineer's Documentation for wall specifications and details
funderplanting) —N\ elaleatleg \ | Low groundcovers to
4 | l front of signage
x I |
3 ALP cae y
\ 1 CUP ana 1 3 XAN Ful
3 BAN rob
i nasal =—loblte. ‘21 20 LOM SH
SPO JS PROPERTY, BQUNDARY  F* PE | 20 LOM NY
Biobasin Planting - 13m? Sete a eeee ee hep per ites 3 MYO ell 4 (edge planting)
Planting at 6/m? fe 1D XAN ful sede fp (underplanting) fedge planting)
11 FIC nod ~ 15% Hea ae atte p tpt ey &
fetes etataf teeters ge Type 1 - refer to detail
11 JUN usi - 15% cf k AP BEEZ I mn
53 LOM hys - 70% eet Pe - r
ys = 10% Edge Type 1 2vtetys* Reinstate all areas of turf damaged
~ refer to detail *.*.*.* y 28 LOM SH during construction works to frontage

Refer to Engineer's

 

 
 

Documentation for all eee ae a
retaining wall details Nata

and specifications st

LEQ ALLEY

 

\

ROAD

 

(edge planting)

   

Refer to Engineer's Documentation for
cross-over details and specifications

NOTE:

Due to service constraints (subsurface services, ENERGEX
requirements for PMT infrastructure) street trees are unable to be
planted within the road reserve.

 

 

Buffer planting within services easement
- refer to Landscape Plan L102 for
easement extents and planting details

 

Bio Basins - Plant Schedule - Total Area = 49m2

 

 

 

BOTANICAL NAME
Ficinia nodosa
Juncus usitatus
Lomandra hystrix

COMMON NAME SIZE NO.
Knobbly Clubrush 75mm tube hh
Common Rush 75mm tube hh
Matt Rush 75mm tube 203
Total tube 291

 

 

Landscape Plant Schedule
CODE BOTANICAL NAME COMMON NAME SIZE NO. CODE
Trees FIC nod
BAN int Banksia interifolia Coastal Banksia roottr 1 JUN usi
CUP ana Cupaniopsis anacardiodes Tuckeroo ‘oott 3 |Lom hys
MEL qui Melaleuca quinquernervia Paper Bark soottr 3
Total 7
Shrubs
‘ALP cae Alpinia caerulea Native Ginger 200mm 5
‘AUS dul Ausfromyrtus dulcis Midyim 200mm B
BAE vir Baeckea virgata Twiggy Myrtle 200mm 5
BAN rob Banksia robur Swamp Banksia 200mm B
BAN spi Banksia spinulosa Hairpin Banksia 200mm 10
SYZ BC* Syzygium australe ‘Bush Christmas’ Syzygium Bush Christmas 200mm 9
SYZ Plx_ Syzygium australe ‘Pinnacle’ Syzygium Pinnacle 200mm n
Total 166
Grasses and Groundcovers
JUN usi Juncus usitafus Common Rush 140mm 9
LOM hys Lomandra hystrix Mat Rush 140mm 42
LOM NY Lomandra longifolia ‘Nyalla’ Lomandra Nyalla 140mm 170
LOM SH Lomandra fluviatilis ‘Shara’ Lomandra Shara 140mm 179
MYO ell Myoporum ellipticum Coastal Boobialla 140mm 8
XAN ful Xanthorrhoea fulva Coastal Grass Tree 140mm 2

 

+ hedging species - spacing indicated on plans

Total 445

NOTE: All 100ltr tree planting to be installed with
a minimum root soil volume of 4m? as per Noosa
Council Decision Notice Condition 10f. dated ‘1st
November 2019.

 

Wall Type 1 with letterboxes (red —
line) & signage plate (blue line) |

- refer to Engineer's Documentation
for wall specifications and details

8x Paver Type 1 with
gravel mulch surround
- refer to specification

Edge Type 1

- refer

Planting as per
overall plan

a Planting as per overall plan

Edge Type 1 - refer to detail —24

& detail

to detail

 

 
 
 
  
 
  
  
  
 
 
 
  

 

 

 

DRIVEWAY

Edge Type 1

- refer to detail

DETAIL PLAN A

VERGE \TURF

Fim

LL 3m

 

SCALE 1:50 (

 

 

 

SCALE 1:100 (A1)

 

IT_IS THE RESPONSIBILITY OF THE CONTRACTOR

} TO CONTACT THE RELEVANT AUTHORITIES TO

 

CONFIRM THE LOCATION OF ALL EXISTING SERVICES
PRIOR TO THE COMMENCEMENT OF EXCAVATION

 

 

 

Check all dimensions before commencement of work.
Check Site boundary dimensions from the Title plans
Check Building Boundary clearances by set out.
Notwithstanding the information supplied on this drawing,
the location, depth and extent of underground or
overhead services are to be confirmed ond protected on
site by the contractor prior to commencement of works.

 

 

 

 

© [5-11-20 | DESIGN AMENDMENTS — FOR APPROVAL | uC
B | 19-08-20] DESIGN AMENDMENTS — FOR APPROVAL _ | uC

 

 

 

 

 

 

 

7 [19-12-15] FOR APPROVAL ic
Issue Date Description By
SS
Drawing title —

LANDSCAPE PLAN

Project —
PROPOSED INDUSTRIAL
COMPLEX

Client -

DEVCON CAPITAL 9 PTY
LTD

Site -
11 LEO ALLEY ROAD
NOOSAVILLE

Consulting Civil &
&

Structural Engineers

COVEY Project Management

ASSOCIATES PTY LTD
ABN 59 137 305 992 & Planning

 

124 DUPORTH AVENUE
PO BOX 16 MAROOCHYDORE QLD 4558
E-MAIL: [email protected]

Ph (07) 5443 77 Fax (07) 5443 7577

Approved:

KEVIN COVEY Béng, CPEng, MIEAust, MSPEPNG, RPEQI823
CHRIS CAMP  BEng(Hons), MeAust, RPEQ4944
—

Checked : JO Design: JC Drown: JC
as noted Date : DEC 2019

  

Scales :
Document Stage : OPW

Project : 192297 Sheet No. L100
Digital Ref : 101 Loiscpe Pen issue: = G

This document is copyright and shall not be copied without
writen approval, nor shal it be used except for the
development and the site specified. /

 

Page 4

PROPERTY BOUNDARY
————} |
|

Large tree species within buffer planting |
~ refer to Landscape Plan L102 for ts

planting extents and species |

   

  

 

Refer to Engineer's Documentation for all
retaining wall details and specifications

 
 
 
 
 

3 ALP cae

   

1 BAE vir

 
 

2 XAN ful

 

 

Buffer planting within services easement |

   
 
   
 

 

 

    
 

 

 

  
  
     
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

    
  

 
     

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

= refer to Landscape Plan L102 for
— 5 SYZ Pl planting extents and species
= at 850mm spacing |
!
}
Fy ~ UNIT 10
ll |
UNIT 8 UNIT 9 . |
PANG ALP cae 12 LOM NY 2 AUS dul
N 4 12 LOM SH 3 ALP cae
5 LOM NY (underplanting) |
\ 1 XAN ful
\S .) 8 LOM SH j
NA pe | . . |
|
WN (underplanting) LJ l Le Lf LJ f 7
3 ALP cae — \— 6 Lom NY 3 ALP cae — — 6 LOM NY 3 ALP cae — LL 5 LOM NY 2 BAN rob
3 ALP cae 1 XAN ful
a y |
2 BAN rob GB (battér_Underplan ting)
1 XAN ful ALP cae 3/ALP cae 12 LOM NY — 20 LOM hys |
6 LOM NY ‘12 LOM SH (batter underplantin } |
LOM NY LOM NY (underplanting) |
6 LOM SH . j-—— 2 BAN rob 2 BAN spi
(underplanting} |
f I CT CT TT __ Va 5 SYZ BC 1 AUS dul |
= 15
{ = - spacing TXAN ful
Biobasin Planting - 36m?
Planting at 6/m? |
33 FIC nod - 15%
33 JUN usi - 15%
Giiil UNIT UNIT 18 UNIT 19 UNIT 20 UINIT 21 y 150 LOM hys - 70% 3 BAN spi |
8 6 LOM NY im Ly
|\— 3 ap cae 6 LOM SH 3 XAN Ful \ |
aN (underplanting) Install Coir mesh to |
5 LOM NY LL + biobasin batters - 19m?
— i i i I 2 XAN ful :
:
1 XAN ful 1 AUS dul a
2 BAN rob 3 ALP cae — \— 6 Lom NY 3 ALP cae — — 6 LOM NY 2 BAN spi
1 BAN int S ‘2,
- 100ltr ul a
12 LOM NY 3 ALP cae ALP cae ALP cae 3 ALP cae — 3 AUS dul
| 12 LOM SH ;
| (underplanting) 3 XAN ful LOM NY LOM NY 5 LOMNY — 8 LOM SH 2 BAN spi 6 LOM hys
* (underplanting) funderplanting)
——T jt 71 yi a t f ii : | J
] WN] TxAN ful!) GE
2
4 ALP!
Indicative extent of soil cells to be installed below hardstand
Ensure all road base has been removed [dashed red line). UNIT 13 UNIT 12 UNIT 11
from planting area - existing subgrade To provide minimum 4m? soil volume per 100ltr tree planting
han-150mm oe : , rilhin
fo be decompactad no less M Refer to L201 indicative detail - subject to final detail design. mm
depth prior to installing topsoil,
Refer to Civil Documentation for edge
thickening detail pertaining to building UNIT 16 UNIT 15 UNIT 14
Footing/stab. a
SEE Check all dimensions before of work.
. . . TT IS THE RESPONSIBILTY OF THE CONTRACTOR Check Site boundary dimensions from the Tile plans
8 & = & TO CONTACT THE RELEVANT AUTHORITIES TO Check Building Boundary clearances by set out
I ————— eel CONFIRM THE LOCATION OF ALL EXISTING SERVICES || Notwithstanding the information supped on ths drawing,
| SCALE 1:100 (A1) PRIOR TO THE COMMENCEMENT OF EXCAVATION the location, depth and extent of underground or overhead
se A : services are to be confirmed and protected on site by the
contractor prior to commencement of works.
Approved , ,
Checked - JO S Consulting Civil & Drawing title - Project - PROPOSED INDUSTRIAL Site — Project 192297 Sheet No. L101
Design - UC Drawn ~ JC a Structural Engineers | KEVIN COVEY Béng.cPEng MEAustusPePNc.RPeo-1823 | | andscape Plan COMPLEX 11 LEO ALLEY ROAD Digital Ref ; \O1 unde Pen Issue:
a C [5-11-20 | DESIGN AMENDMENTS — FOR APPROVAL [JC COVEY . CHRIS CAMP BEng(Hons),MIEAust,RPEQ—4944 ~
Scales - 1:100(A1) Date - DEC 2019 | strs-as-zo] veSiGN AWENDWENTS = FOR APPROVAL lu Project Management] 124 puPORTH AVENUE Ph (07) 5443 7777 Client - DEVCON CAPITAL 9 PTY NOOSAVILLE This Document is copyright and shall not be copied
Document Stage — [19-12-19] FOR APPROVAL lc | ASSOCIATES PTY LTD, Planning Tere SHVBORE au 4558 Fax (07) 5443 7577 LTD without written approval, nor shall it be used except
9 OPW Issue Date Desorption y ABN 59 137 305 992 FRAIL: engineersOcovey-com.ou for the Development and the Site Specified.

 

 

 

 

c:\12d8\data\\120SERVER\\192297_280\DNG Covey\Landscape\OPW\L'0’ Landscape Plan.dwg

Page 5

 

No planting within 1

Sm, wide

 

 

 

UNIT &

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

UNIT 3

mWM

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

L101 for internal planting details “

 

 

UNIT 5 UNIT 6 UNIT # UNIT 8 UNIT 9 UNIT 10
jy f en f uw Li f po bs
a
Refer to Landscape Plan L101
for biobasin |planting details
4 planting Bo
LD
| | | |
ES! 5 = Ee =
UNIT 17 uve EA NIT 19 UNIT 2 a
: : {yo | Li)
Refer to Landscape Plans L100 &

   

easement
hs

 

 

 

 

 

“SL

h

 

iP
3m_ width

 

 

 

 

 

 

 

 

 

 

 

ea A
|
[
| l
con |

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

UNIT 16

— 4

UNIT

 

 

Mix B Buffer Planting

14 UNIT 4 UINIT

 

 

 

 

 

 

LI

 

 

m of services

1 MEL qui

 

1 COR tes

Mix A Buffer Planting

TREE PLANTING SCHEDULE

 

 

 

CODE BOTANICAL NAME COMMON NAME SIZE NO.
Trees — as indicated on plans

COR cit Corymbia citriodora Spotted Gum 25itr 1
COR tes Corymbia tessellaris Moreton Bay Ash 2sitr 1
IEUC mic Eucalyptus microcorys Tallowwood 25ttr 1
LOP sua Lophostemon suaveolans Swamp Box 2site 1
MEL qui Melaleuca quinguenervia Paperbark 2sttr 3

 

 

1 COR cit

 

Total 7

 

 

 

 

1 MEL qui

 

 

= 18m spacing |
-|plant in groups of 3ar 5 |

 

  

 

 

 

 

 

ECE C EERE EREE DEORE EERE

 

1 EUC mic

TyP.8m spacing

 

 

 

 

 

 

 

 

 

 

 

3m wide sewer easement

 

 

 

wWWELP

Refer to
Landscape Plan |
L100 For biobasin

 

 

(red dashed line)

Refer to Landscape Plans L100 &
L101 for internal planting details

\ Refer to Landscape Plans L100 &

L100 for internal planting details

Refer to Landscape Plans L100 &
L101 for internal planting details

| | J
ULE EET LLIN ELLA ILIAD IEE

 

1 MEL qui

 

 

 

 

 

 

 

 

SCALE 1:200 (Al) HE

 

 

 

 

LOCATION A BUFFER PLANTING SCHEDULE 325m?
CODE BOTANICAL NAME COMMON NAME SIZE NO.
Shrubs - to be planted at 1 per 2m’
ALP cae Alpinia caerulea Native Ginger 75mm tube 8
BAN rob Banksia robur Swamp Banksia 75mm tube 2
DOD tri Dodonea friquetra Native Hop Bush 75mm tube 2%
HOM nut —Homolanthus nutans Bleeding Heart 75mm tube 8
IMAC tan Macaranga tanarius Bullock Heart 75mm tube 4
MEL pac Melaleuca pachyhylla Wallum Bottlebrush 75mm tube 2
MEL vim Melaleuca viminalis Weeping Bottlebrush 75mm tube 2
MEL aff Melastoma affine Lasiandra 75mm tube 18
Total 162
Groundcovers - to be planted at 1 per 1m?
cis ant Cissus antartica Water Vine 75mm tube 35
GAH sie Gahnia sieberiana Saw Sedge 75mm tube 60
HIB sca Hibbertia scandens Guinea Flower 75mm tube 35
JUN usi Juncus usitafus Common Rush 75mm tube 60
LOM hys — Lomandra hystrix Mat Rush 75mm tube 60
MYO ell — Myoporum eltipticum Coastal Boobialla 75mm tube 35
XAN ful___Xanfhorrhoea fulva Coastal Grass Tree 75mm tube 40
Total 325
LOCATION B BUFFER PLANTING SCHEDULE 170m?
CODE BOTANICAL NAME COMMON NAME SIZE NO.
Shrubs - to be planted at 1 per 2m’
ALP cae Alpinia caerulea Native Ginger 75mm tube 5
BAN rob Banksia robur Swamp Banksia 75mm tube 18
DOD tri Dodonea triquetra Native Hop Bush 75mm tube 2
IMAC tan Macaranga tanarius Bullock Heart 75mm tube 10
MEL pac Melaleuca pachyhylla Wallum Bottlebrush 75mm tube 16
MEL aff | Melastoma affine Lasiandra 75mm tube 1h
SYZ AB’ Syzygium australe ‘Aussie Boomer’ Syzygium Aussie Boomer 75mm tube 5
SYZ.CA°_ Syzygium australe ‘Cascade’ Syzygium Cascade 5mm tube 16
Total 116
Groundcovers - to be planted at 1 per 1m*
cis ant Cissus antartica Water Vine 75mm tube 20
GAH sie Gahnia sieberiana Saw Sedge 75mm tube 34
JUN usi Juncus usitatus Common Rush 75mm tube 34
LOM hys — Lomandra hystrix Mat Rush 75mm tube 34
MYO ell Myoporum ellipticum Coastal Boobialla 75mm tube 20
XAN ful__Xanthorrhoea fulva Coastal Grass Tree 75mm tube 28

 

“hedging species - spacing indicated on plans

Total 170

Check all dimensions before of work.

 

IT IS THE RESPONSIBILITY OF THE CONTRACTOR
TO CONTACT THE RELEVANT AUTHORITIES TO
CONFIRM THE LOCATION OF ALL EXISTING SERVICES
PRIOR TO THE COMMENCEMENT OF EXCAVATION

 

 

 

Check Site boundary dimensions from the Title plans
Check Building Boundary clearances by set out.

Notwithstanding the information supplied on this drawing,
the location, depth and extent of underground or overhead!

 

 

 

 

 

 

 

planting details 4 ; services are to be confirmed and protected on site by the|
contractor prior to commencement of works.
‘Approved : .
Checked - JO m\ Consulting Civil & Drawing title - Project - PROPOSED INDUSTRIAL Site - Project 192297 Sheet No. L102
Design - uC Drawn — JC A Structural Engineers | KEVIN COVEY BEng,cPEngMIEAust,MSPEPNG,RPeQ-1823 | Landscape Buffer Plan COMPLEX 11 LEO ALLEY ROAD Digital Ref ; L101 Lendsope Pon Issue: CO

Scales - 1:200(A1) Date — DEC 2019

 

 

 

Document Stage -

OPW

ne COVEY Project Management

 

 

C [5-11-20 | DESIGN AWENDMENTS — FOR APPROVAL [JC
B [19-03-20] DESIGN ANENDNENTS — FOR APPROVAL
‘A [19-12-19] FOR APPROVAL

 

 

lc | ASSOCIATES PTY LTD

 

 

issue Date

Description

By

yen 59 137 305 aan & Planning

 

CHRIS CAMP BEng(Hons),MIEAust,RPEQ—4944
124 DUPORTH AVENUE

PO BOX 16
MAROOCHYDORE QLD 4558

Ph (07) 5443. 7777
Fax (07) 5443 7577

 

E-MAIL: [email protected]

 

 

 

Client - DEVCON CAPITAL 9 PTY
LTD

 

 

NOOSAVILLE

 

 

This Document is copyright and shall not be copied
without written approval, nor shall it be used except
for the Development and the Site Specified.

 

 

c:\12dS\datal\ 12DSERVER\ 192297_2

 

Covey\\Landscape\OPW\LIO1 Landscape Plan.dwg

Page 6

 

1 Shrub / groundcover species as per planting plan

2 100 mm composted forest mulch as specified avoiding contact
with tree stem

3 Min 300mm depth imported topsoil as specified.

4 Planting hole two times wider than plant pot size. Use friable
imported topsoil light compaction only.

5 Slow release fertilizer as per Manufacturer's recommendations
Choose appropriate fertilser for species selection

6 — Sub-grade,

 

TYPICAL 140mm - 200mm PLANTING

NTS

 

ADVANCED TREE PLANTING - GARDEN BEDS

   
 

 

   

 

 

SPECIFICATION NOTES
SOIL AND MULCH

EXCAVATION AND DRAINAGE

Break up and remove any debris from construction works to achieve
required planting depths. Excavate to bring the subsoil to a minimum
of 300 mm below finished design levels. Shape the subsoil to fall
to subsoil drains where applicable, Break up the subsoil to a
further depth of 150 mm. Sub-surface drainage as per the attached
3 details is to be incorporated to all planting areas that are enclosed
. by hard edging, are located on controlled compacted fill and or not
otherwise drained. Install imported or ameliorated topsoil over
subsoil as per spec. Imported and site soil is to be mixed insitu

300

 

1 100mm mulch as specified Ensure all earthworks are contoured to drain effectively
2 Imported / ameliorated topsoil laid to minimum

300mm depth to specification. Fertiliser to be SOIL TEST

applied to Manufacturer's recommendations to

top layer of topsoil prior to turf being Laid Obtain bulked sample soil test from NATA registered laboratory on
3 _De-compacted subsoil to 150mm depth site topsoil to be used on job. Obtain seperate tests for various
4 Ensure all garden bed areas and tree pits are soils used in works.

free draining Test for pH, organic matter, Ca / Mg Ratio, Nitrate-N, Ammonium-N,

P, Ca, Mg, K, So, S, Al, Si, B, Fe, Ma, Cu, Z, Mo, Co, Se and

TYPICAL GARDEN BED PROFILE ameliorate to appropriate levels for proposed planting in accordance
——eeeerrroerooanmmnedlil'eernw” with recommendations of suitably qualified agronomist or soil
NTS scientist.

Provide soil amelioration certificate from qualified agronomist
Provide AS4419 compliance certificate for all imported soil
Geotechnical information including bore logs showing depth of fill,
OCP’s & allowable bearing capabilities for footing designs as
required.

TOPSOIL - SUPPLY AND PLACEMENT

Turf areas are to be filled with fit for purpose imported topsoil to
a minimum of 100 mm depth over cultivated sub-grade.

Planting areas are to be filled with fit for purpose imported topsoil

to a minimum of 300mm depth over cultivated sub-grade

. 25 ltr tree pits are to be are to be filled with fit for purpose
imported topsoil to a minimum of 0.5m? volume.

* 100Itr trees are to have no less than 4m? soil volume to
support healthy establishment and growth,

© Supplier of imported soils, as well as intended mix is to be
nominated prior to start of works and approved by
Superintendent.

* Where structural cell systems are to be used refer to
Manufacturer's specifications and details for recommended soil
volumes.

© Add and mix composted material to topsoil when spreading to
help inoculate soil

. A slow release fertiliser such as ‘Osmocote’ or equivalent is to
be incorporated with individual planting in accordance with the
Manufacturer's recommendations.

© — Soil is to be mounded to facilitate good drainage (max 1:3

    

7 Ved WN grade)
at oN * To improve the water holding capacity of the dry and well
SAN v\ drained soils on site, addition of a moisture holding product

 

such as ‘Hydrocell’ or 'Rainsaver’ is recommended following
manufacturers guidelines.

Finish topsoil flush with abutting kerbs, mowing strips, and paved
surfaces unless otherwise shown. Feather edges into adjoining
undisturbed ground,

1 AS2303:2018- Tree Stock for Landscape Use compliant tree
stock with Arborist certification - refer to specification
notes. Species and pot size as per schedule. Stem taper
finished flush with finished soil level, allow for settlement.

2 100mm depth organic mulch as specified, avoiding contact with
tree stem.

3 Excavated planting hole 2x width of rootball with sloping
sides, backfilled with topsoil as specified
Soil gently mounded to top of root plate.

4 Rootball

5 Lightly compacted soil under root package to prevent tree
from slumping

6 50x50x2400mm Hardwood stakes driven into ground avoiding
rootball. Tree ties to be hessian tie.

7 Min. 300mm imported topsoil as specified to garden areas.
8 Cultivated / ripped subgrade.
9 Ensure all garden bed areas and tree pits are free draining

Width of garden as per plans

All timber products to have Forest
Stewardship Council® (FSC®)

ORGANIC MULCH

Ensure mulch is produced by chipper, aged, comprised of leaf and limb
material of varying sizes, free of foreign matter including rock,
soil/sediment contamination and is applied to all planting areas as per
requirements. Reke to an even surface flush with the surrounding
finished levels. Avoid placement against green plant stems and keep
below tree trunk flares. Mulch to finish level with adjoining edging

Mulch to comply with requirements set out in AS4454:2012- Composts,
Soil Conditioners and Mulches.

Mulch to be free of damaging material and preferably aged for a
minimum of two (2) months after chipping, before being spread on site
Forest blend mulch is the preferred mulch for all areas

Tip mulch is not appropriate for the following reasons

© may not be of uniform size and quality.

o it may contain material from diseased vegetation, which may
spread potentially fatal diseases (e.g, Phellinus), fungus or
pathogens, (e.g. Phytophtora).

© mulch that is not properly composted may introduce weed seeds.

© can often be hydrophobic, causing drought stress in plants.

© possible growth inhibiting properties due to phytotoxic chemicals
e.g, polyphenols

© poorly composted mulch may cause nitrogen draw down, locking
up nutrients needed for plant growth

© may contain metals and other rubbish which may cause a health
risk to workers.

Mulch to be spread before planting to prevent erosion, loss of soil
moisture and weed seed germination.

Mulch is to be installed as per landscape drawing, to a depth of 100mm
unless otherwise specified

Mulch depth is not to exceed 150mm. Deep mulching - particularly with
mulch containing fines - can restrict air flow causing anaerobic
decomposition to take place. A possible side effect of this is alcohol
production which has the potential to damage plant cell walls and roots.
Anaerobic compost may not have a high enough temperatures to
effectively destroy pathogens.

Rake mulch to an even surface level with surrounding finish

Spread mulch so it is smooth and evenly graded between design surface
levels, sloped towards the base of the plant stems

Mulches are not to be in contact with plant stems. Ensure mulch is no
closer to the stem than:

© 50mm for shrubs
0 100mm for trees.

Form a small bermed dish around plant stems to facilitate flow of water
and nutrients to rootball

Preferably, the area beneath tree canopy (dripline) is to be blanket
mulched

Surrounds of plants planted in riplines (plough lines “ripped” into soil to
decompact and loosen soil) and grass areas, provide mulch to 750mm
diameter with trunk at centre.

SEDIMENT AND EROSION

The Contractor shall ensure that measures are undertaken to minimize
erosion of exposed surfaces during the life of the project. Any localized
overland flow causing scour through the site is to be rectified by the
Contractor with appropriate methods determined in consultation with the
Superintendent. The Contractor shall inspect the site after each
significant rain event for erosion.

INORGANIC MULCH

Gravel Mulch Type 1 to be Nom.45mm¢ washed Mary River rounds
installed to a depth of 100mm laid on pinned weed suppressant
geotextile matting

TURF - SUPPLY AND LAY

Turf installed to road verge must be “A” grade Couch with minimum
sod depth of 25 mm, All turf must be installed within 24 hours of
being cut. Runs must butt hard against each other and seams top
dressed with topsoil. Turf to be rolled to provide an even surface
free from depressions and bumps. Any depressions / damage within
turf areas are to be replaced or top dressed with clean river sand
as directed by Superintendent.

CONTAINERISED PLANT MATERIAL

AS2303:18 / NATSPEC.
Tree stock sized 300mm and over is to be compliant with
AS2303:2018- Tree Stock for Landscape Use, and is to be certified
as compliant by an independent level 5 Arborist, Arborist inspection
tags are to be attached fo fhe tree before delivery to site and
remain attached until the stock has been accepted by Council as
Off Maintenance

Superintendent to approve plant material prior to planting
Planting is to be carried out in a manner consistent with good
horticultural practice. Plants are to be planted at correct depth
allowing for ‘settling’. Soil greater than 10mm in depth is not to be
placed over the rootball or against the stem. All 300mm pot and
larger plant material is to be guyed and staked as per advanced
Tree Planting Detail unless otherwise approved by the
Superintendent. Smaller plant stock is to be staked as necessary.
Stakes shall not pass through the rootball of plant at time of
planting or any time thereafter. Nursery stakes are to be removed
within 3 months of planting

Stock may be rejected if plants are

a) undersized proportional to specified container size or if
the root system is underdeveloped

b) oversized proportional to specified container size or
severely root bound

c) unbalanced or uncharacteristic of normal or specified
growth pattern for the species

d) not suitably acclimatised for the specific environment

e) diseased, infested with pests or suffering from other
form of significant stress

f) tree stock is not compliant with AS2303:2018-Tree Stock

for Landscape Use, and is not certified as compliant by
level 5 Arborist

MATERIALS - SUPPLY AND INSTALL

GRAVEL MULCH
Install gravel mulch to Nom.depth of 100mm. Suggested minimum
diameter to be no less than 20mm. Preference is to be given to
the use of recycled concrete product installed as inorganic mulch
where practicable, specifically in areas of lesser visibility. If
recycled concrete product is selected for areas of higher visibility,
such as path edges or in planting areas, ensure the recycled
concrete is of the highest grade possible and free from materials
such as steel and plastic. In general, any recycled concrete product
is to be free of all deleterious materials and rubbish, both
inorganic and organic. Ensure even fall across surface is achieved
to prevent ponding

PAVER TYPE 1

Type: 400x400x50mm concrete paver
Suggested Manufacturer/Type: ‘Quadro 50° by Adbri Masonry
Tel. 1300 365 565

Suggested finish/colour: Charcoal

Refer to detail for installation details

Check all dimensions before commencement of work.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SCALE 1:10 Chain of Custody certification TT IS THE RESPONSIBILITY OF THE CONTRACTOR Check Site boundary dimensions from the Title plans
TO CONTACT THE RELEVANT AUTHORITIES TO Check Building Boundary clearances by set out
CONFIRM THE LOCATION OF ALL EXISTING SERVICES |] Notwithstancing the information supplied on this drovng,
PRIOR TO THE COMMENCEMENT OF EXCAVATION the location, depth and extent of underground or overhead
services are to be confirmed and protected on site by the
contractor prior to commencement of works.
‘Approved 5 i
Checked = 10 2 Consulting Civil & Drawing title - Project - PROPOSED INDUSTRIAL Site - Project 192297 Sheet No. L200
Design - JC Drawn - JC a Structural Engineers | KEVIN COVEY aéng,ceEng.Mevust.usPePNc.rPeo-1823 | Landscape Details & COMPLEX 11 LEO ALLEY ROAD Digital Ref : 1200 Landscape Detcis Issue: C
_ AS NOTED - © [5-11-20 | DESIGN AVENOWENTS — FOR APPROVAL [WC CcCOoOVveS CHRIS. CAMP BEng(Hons),MIEAust,RPEQ—4944 vee = - __ -
Scales Date - DEC 2019 fs 75-05-20) DESIGN ANENDWENTS FOR APPROVAL [UC Project Management} 124 puPORTH AVENUE Ph (07) 5443 7777 Specification Client - DEVCON CAPITAL 9 PTY NOOSAVILLE This Document is copyright and shall not be copied
7A I9=12=16| FOR APPROVAL uc] ASSOCIATESPTYLTD 4 pignnin PO BOX 16 Fax (07) 5443 7577 without written approval, nor shall it be used except
Document Stage — OPW — ABN 59.157 305 992 9g MAROOCHYDORE QLD 4558 LTD for the Development and the Site Specified.
Issue Date Description By E-MAIL: [email protected]

 

 

 

 

 

 

 

e:\12dS\data\1

 

ERVER\192297_280\DWG

Covey \Landscape\OPW\L200 Landscape Details.dwg

Page 7

 

1 ‘A’ grade Couch turf or similar approved. Grass to be
laid along contours with staggered, close butted joints
so that finished turf surface is flush with adjacent

1 surface levels. Desirable maximum slope gradient 1:6
(though 1:4 is acceptable where necessary)
2 2 Imported topsoil laid to minimum 100mm depth to

specification, Fertiliser to be applied to Manufacturer's
recommendations to top layer of topsoil prior to turf

 

   
 

 

 

 

 

 

 

 

 

 

 

 

 

1 Selected garden bed mulch (depth as

 

 

~\

 

IT_IS THE RESPONSIBILITY OF THE CONTRACTOR
TO CONTACT THE RELEVANT AUTHORITIES TO
CONFIRM THE LOCATION OF ALL EXISTING SERVICES
PRIOR TO THE COMMENCEMENT OF EXCAVATION

 

 

Orientation
Angle and space pavers as indicated on working drawing.
If not specified space equally as shown on drawings.

 

 

Weed suppressant geotextile layer between
subgrade and gravel mulch

Concrete haunch to all edges. Ensure top of
haunch is min. 25mm below surface level

Finished mulch level
Refer to plan for type.

  
 

 

 

 

 

 

 

 

 

Scales - AS NOTED Date - DEC 2019

 

 

 

 

 

 

 

 

 

 

 

ma ASSOCIATES PTY LTD i PO BOX 16 Fax (07) 5443 7577 without written approval, nor shall it be used except
7 [19-12-19 FOR APPROVAL jc & Planning TAREOCHYBORE QLD 4858 pproval, i ed excep!
OPW Issue Date Description By AON 89 157 308 982 E-MAIL: [email protected] for the Development and the Site Specifies

5 |16-05-2o) DESIGN AUENOUENTS — FOR APPROVAL [36 cove: Project Management] 124 pupoRTH AVENUE Ph (07) 5443 7777

being laid specified) to finish flush with timber edge NOM. 200 ‘oO
3 Relieve sub-soil compaction to 75mm & ensure free 2 Dressed 25x100mm Hardwood edge. Smm A A is
draining in preparation for topsoil application. chamfer to all edges fixed with 75mm Sey Ys e
‘2 4 Turf to be rolled to provide an even surface free of galvanised batten screws through pilot hole,
depressions and bumps 3 Turf as specified
4 Topsoil as specified \;
3 NOTE 5 Sub-grade.
Following laying of turf irrigate immediately until topsoil is 6 Treated Timber Stake min. 50x300mm.
moistened to full depth. Ensure irrigation regime is carried 7 Planting area.
out until grass is fully established Coarse bedding sand
100mm depth compacted base course
All timber products to have Forest
Stewardship Council® (FSC®) Chain of Subgrade
TYPICAL TURF PROFILE EDGE TYPE 1 Custody certification PAVER TYPE 1
NTS TIMBER EDGE NTS
NTS
AS2303:2018- Tree Stock for Landscape Use equivalent
tree stock. Species and pot size as per schedule
2 100 mm composted forest mulch as specified avoiding
contact with tree stem
3 Excavated planting hole 2x width of rootball with
sloping sides, backfilled with site soil mixed with
imported AS4419 compliant topsoil and TerraCottem to
Manufacturer's specification. Soil gently mounded to
top of root plate
4 Subsoil
5 Structural topsoil - total volume to be 4m? per tree
planting
6 Structural modules to provide structural integrity to
above car park hardstand and allow for tree root
growth, aeration and irrigation
7 Root barrier
8 Aeration pipe network
39 100mm depth drainage layer
10 Groundcover planting
1 Car park
NOTE:
‘Adjacent detail is indicative only - final design
and selected product to be installed as per
Manufacturer’s specifications and guidance
Check all dimensions before commencement of work.
CAR PARK SHADE TREE - STRUCTURAL CELL SYSTEM Check Site boundary dimensions from the Title plans
Check Building Boundary clearances by set out
NTS Notwithstanding the information supplied on this drawing,
the location, depth and extent of underground or overhead
services are to be confirmed and protected on site by the
contractor prior to commencement of works.
‘Approved i
2 Consulting Civil & i‘ Drawing title - Project - PROPOSED INDUSTRIAL Site - Project 192297 Sheet No. L201
Drawn - JC a Structural Engineers | KEVIN COVEY aéng,cPEng,MeAust.usPePNG.RPEO-18231 Landscape Details 11 LEO ALLEY ROAD Digital Ref : 1200 Landscape Detcis Issue:

CHRIS CAMP BEng(Hons),MIEAust,RPEQ—4944

 

 

 

 

cient - DEVCON CAPITAL 9 PTY NOOSAVILLE

 

 

This Document is copyright and shall not be copied

 

 

 

 

 

 

SERVER\\192297_280\DWG Covey\Landscape\OPW\L200 Landscape Details.dwg

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.