Original source · versioned page text
Attachment 4 - Landscape OPW Plans
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnUNIX S UNIT 6 UNIT 7 UNIT 8 UNIT 9 INTERNAL PLANTING Install 2 selection of shrub and groundcover species to soften and screen built form within the development. 100ltr advance stock trees are to be planted utilising subsurface soil cells to provide a minimum soil volume of 4m> per tree planting LEO ALLEY ROAD ENTRANCE PLANTING Install @ Hered mix of shrub and groundcover species to screen the front fencing of the development. 100\tr advance stock trees are to be planted to provide canopy screening to development frontage LANDSCAPE BUFFER PLANTING install @ mix of shrub and groundcover species within the 3m wide easement areas, Install large tree species outside of easement areas as per loactions noted on plans. Refer to Landscape Plan L102 for planting extents and plant schedules. 8 5 § E — SCALE 1:250 (A1) PROJECT SCOPE Landscape Soil Test 1 Imported Top Soil to 100\tr trees (4m* per tree) 28m? 100mm Imported Top Soil to all turf areas (allowance) 9m? 300mm Imported Top Soil to all planting beds 55m? 100mm Imported Top Soil to buffer planting areas 50m? Verge turf (allowance) 87m? Temporary turf to biobasin floors 49m? 400mm depth organic mulch all planting areas 19m? 50mm depth straw mulch to Biobasin floors 25m? Jute mesh to Biobasin floors 49m? Coir mesh to biobasin batters 28m? 100mm depth mulch to buffer planting areas 50m? Paver Type 1 - 400x400mm concrete pavers 8 100mm depth gravel mulch - surround to pavers 0.5m? Trees 100ltr bags 7 200mm pots to planting areas (shrub species) 1h6 1hOmm pots to planting areas (groundcover species) 445 75mm tubes to Biobasin floors (macrophyte species) 201 75mm tubes to buffer planting areas 780 Edge Type 1 - as per detail 161m Landscape and Biobasin Works Establishment and Maintenance Period Establishment Period 3 months Maintenance Period 9 months It is the Contractors responsibility to ensure that landscaping works are maintained throughout the maintenance period. Vandalism or unforseen damage to landscapes may be quoted separately prior to ‘Off-Maintenance’ Other Provide Arborist AS2303:2018- Tree Stock for Landscape Use certification for all trees Provide soil amelioration certificate from qualified Agronomist Provide AS4419 compliance certificate for all imported soil Exclusions to Landscape Scope Retaining Walls Bulk shaping of earthworks & fill Stormwater inlets/outlets to Bio-basin SCOPE OF WORKS Landscape works to include the following * Site preliminaries * Top soil soil test and analysis * Excavation and drainage to planting areas * Supply and install subsurface soil cells © Topsoil supply and placement © Turf supply and lay * Bio basin - removal of sacrificial turf and install of macrophyte species as per documentation * Containerised plant material - supply and installation * Organic mulch - supply and installation * 3 month establishment of landscape works * 3 month establishment of biobasin * 9 month maintenance of landscape works * 9 month establishment and maintenance of bio basin * Attendance at Council pre-start, On and Off-Maintenance meetings Contractor shall take full account of documentation of Civil Engineering, Hydraulic and Electrical Engineering Works. SITE PRELIMINARIES Contractor to confirm planting boundaries / extent of works / loading / handling areas etc prior to commencement. Contractor to attend pre-start meeting with Superintendent and Council. Subsurface soil cell system is subject to detail design - to be installed strictly under supervision/guidance from Manufacturer. Suggested Manufacturer: City Green Tel. 1300 066 949 Web. https://citygreen.com/ Check all dimensions before commencement of work. Check Site boundary dimensions from the Title plans Check Building Boundary clearances by set out. Notwithstanding the information supplied on this drawing, the location, depth and extent of underground or overhead! services are to be confirmed and protected on site by the contractor prior to commencement of works. IT_IS THE RESPONSIBILITY OF THE CONTRACTOR TO CONTACT THE RELEVANT AUTHORITIES TO CONFIRM THE LOCATION OF ALL EXISTING SERVICES PRIOR TO THE COMMENCEMENT OF EXCAVATION ‘Approved Consulting Civil & a Structural Engineers | KEVIN COVEY BEng,CPEng,MIEAust,MSPEPNG,RPEQ—1823 CHRIS CAMP BEng(Hons),MIEAust,RPEQ—4944 Checked - JO Design = JC Drown = JC Seales = 1:250(A1) Date - ec 2019 fe DESIGN AVENOWENTS — FOR APPROVAL [JC CcCOoOVves DESIGN AVENOMENTS — FOR APPROVAL |v Project Management] 424 pupoRTH AVENUE Ph (07) 5443 7777 19-12-19] PO BOX 16 Fax (07) 5443 7577 MAROOCHYDORE QLD 4558 APPROVAL ISSUE me | ASSOCIATES PTY LTD & Planning Document Stage — oPW sou Dak Issue Date ABN 59 137 305 992 Description By E-MAIL: [email protected] Drawing title - Extent of Works COMPLEX Project - PROPOSED INDUSTRIAL Site - Project 192297 Sheet No. LO01 11 LEO ALLEY ROAD Digital Ref : 1001 Extent of Works Issue: © LTD Client - DEVCON CAPITAL 9 PTY NOOSAVILLE This Document is copyright and shall not be copied without written approval, nor shall it be used except for the Development and the Site Specifiec e:\12dS\data\ 12DSERVER\192297_280\DWG Covey \Landscape\OPW\LOOT Extent oF Works.dwg
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.