Decision Notice - OPW23 0175 [As Published] · OPW23/0175
4. ASSESSMENT MANAGER CONDITIONS
APPROVED PLANS
1. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are listed in the following table unless
otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
S23-112-C02 A Civil Works Plan – As annotated by Council 25/09/2023
S23-112-C03 A Typical Details 25/09/2023
CURRENCY PERIOD
2. The Currency Period for this development approval lapses if the development has not
substantially started by 29 November 2025, unless an application to extend the currency
period is approved by Council.
GENERAL CONDITIONS
Engineering
3. A revised Construction Management Plan (CMP) must be submitted to Council prior to the
pre-start meeting. Note that due to the location of the site Council is unlikely to support
excessive construction vehicles parking along Seaview Terrace. The revised CMP must
specifically address the following:
a. Traffic Management during all aspects of the construct phase including:
i. A Traffic Management Control Plan in accordance with Manual of Uniform Traffic
Control Devices (MUTCD) detailing all temporary signage and traffic control
measures prior to construction.
ii. Maintenance of safe pedestrian access across the frontage of the site both during
daily construction and after daily construction has ceased. Note that pedestrian
access along Seaview Terrace including but not limited to the public beach
access must be maintained at all times.
iii. Proposed fencing to the site during the construction phase of the development.
iv. Adequate parking arrangements for construction workers. Note that public and
emergency vehicle access along Seaview Terrace must be maintained at
all times. Construction vehicles are to abide by parking rules and
regulations and are not to block resident’s driveways or park on yellow line
marking under any circumstances. The revised CMP must provide an
alternative carpark location and transportation for construction vehicles
should public carparks be occupied.
v. No queuing of trucks is permitted on residential streets, especially prior to
7.00am. Further parked trucks must have engines turned off.
b. Maintenance and protection of water quality and existing drainage lines through the
construction site through the implementation of appropriate erosion and sediment
control measures.
c. Works programme identifying key components of the works and their respective
durations.
d. Establishment of a communication protocol with the general public, adjoining owners,
emergency services and local businesses to advise of agreed construction times,
impacts on traffic and services and other relevant issues.
Page 2 of 7
Document Set ID: 22733163
Version: 3, Version Date: 15/12/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - OPW23 0175 [As Published].pdfRelated documentApplication case desk ↗
About this file
- File size
- 163 KB (small file)
- File type
No other editions are linked here.