NOOSA COUNCIL IDAS Development Application Decision Notice                                                    4 of 7


12.    The obsolete sewer main and the end of the line manhole along the north boundary line of the site should
       be dug out and removed from the site.

13.    A registered easement shall be created over the zone of influence of all sewers within the subject site.
       The easement shall generally be parallel to and centred over the sewer main and be equivalent in width to
       twice the depth to invert level of the sewer at the deepest point within the allotment (measured from the
       finished surface) and be no less than 3.0m wide overall. In this regard a licensed surveyor shall
       accurately locate all sewer mains and determine the necessary width of the easement, which shall be
       shown on any plans submitted for Operational Works / Building Works approval. To this extent the
       surveyor shall certify that the sewer and the zone of influence is wholly contained within the easement to
       be created.
       A duly executed copy of the easement shall be submitted to Council for perusal prior to Council’s
       endorsement of the Plan of Survey.

       Any changes required by Council’s Solicitor must be corrected immediately.
14.    No building or other structure shall be constructed or encroach over an easement.
Power Supply
15.    A separate underground electricity service shall be provided to each of Lot 1 and Lot 2
       In this regard, an approved ENERGEX Electrical Design Consultant shall work in conjunction with
       Council’s Manager - Works Support to prepare detailed designs of the electrical proposal.

       The detailed deigns shall then be submitted to ENERGEX for approval and a copy of their approval
       submitted to Council in conjunction with a “Certificate of Electricity Supply for Proposed Subdivisions”
       (prepared by an approved ENERGEX Electrical Design Consultant) prior to Council endorsing the Plan of
       Survey.

      Any agreement with ENERGEX or an approved ENERGEX Electrical Design Consultant shall be wholly at
      the applicant’s expense and shall not entail a financial encumbrance on future purchasers of the proposed
      lots.
Telecommunication
16.    The requirements for TELECOMMUNICATION services shall be satisfied in relation to the provision of
       telephone services to the proposed lots. In this regard written confirmation from an approved
       telecommunication agency shall be submitted to the Council prior to Council endorsing the Plan of
       Survey.
Vegetation Protection & Weed Removal
17.    Existing native trees on site and within the road reserve are to be retained, except where required to be
       removed due to a development approval or the conduct of an approved use. Driveways and buildings
       sites should be designed to avoid the removal of native vegetation.

18.    All Class 1, Class 2 and Class 3 pest plants declared under the Land Protection (Pest and Stock Route
       Management) Act 2002 and including all Camphor Laurel trees on the property are to be controlled on the
       site prior to Council endorsement of the Plan of Survey. In this context “controlled” shall mean, for class 1
       and 2 pests, completely eradicated. For class 3 pests it shall mean removal of the plants where they
       threaten environmentally significant areas of the site such as riparian zones and areas of natural
       vegetation.
       Where class 3 plants are removed as a result of this condition and there is not sufficient natural
       regeneration of native species, the areas shall be replanted with endemic native species so that a
       sustainable natural ecosystem is restored.

       Council’s Conservation Management Supervisor will not inspect the site until 30 days after the weed
       treatment and replanting is complete.
19.    If there is any cleared vegetation it shall be suitably processed by one of the following methods and
       removed from the site:-

       19.1. Processing through a wood chipper or shredder. The resulting mulch is to be stockpiled loose in
             heaps of less than 1000 cubic metres, less than 2.5 metres high with a minimum of 10 metres
             between edges of heaps.

       19.2. Disposal for firewood.

       19.3. Disposal for landscaping purposes.




NSC c:\docume~1\rhr\locals~1\temp\bcl technologies\easypdf 5\@bcl@c80ef45d\@[email protected]

Used in these records

About this file

File size
33 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - 010.2007.00000694.001 [As Published].pdf · 33 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.