19.4. Transport to alternative site for breaking down materials provided that all necessary permits have
been obtained to allow the alternate site to be used for this purpose.
The disposal method for clearing works is to be submitted in conjunction with an application for a
Development Permit for Operational Work. The Applicant is advised that other methods may be
considered provided full details of the method are submitted.
The Applicant is also advised that burning off is an unacceptable method of disposal.
Erosion and Sediment Control
20. Any person acting on this permit shall prevent erosion and sediment export from leaving the site. Site
control measures such as silt fencing, controlled gravel access to the site and controlled disposal of
waste, will be necessary. This particularly relevant to the required relocation of the existing sewer main.
Bonds
21. Prior to Council giving approval for Development Permit for Operational Works the applicant shall submit
$4,000 bond to ensure compliance with the conditions of this approval. The bond will be returned
following the acceptance of all works.
General
22. For the following classes of work associated with development, a Development Permit for Operational
Works must be obtained prior to commencement of works relating to that class of work.
22.1. Sewer.
23. To facilitate production of As Constructed drawings it is suggested that all design drawings are submitted
in the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the use of ADAC are
available at www.adac.com.au).
24. As Constructed drawings and data shall be certified by a qualified experienced Civil Engineer for design
intent, and a Licensed Surveyor shall certify the cadastre and the location, level and type of all services
and structures. All of which shall be submitted to Council for checking and for Council’s records.
The data must fully detail levels for all engineering works including but not limited to sewer main and
manholes. The data shall be submitted in the Asset Design and As Constructed (ADAC) digital format.
(Guidelines on the use of ADAC are available at www.adac.com.au).
25. Endorsement of the Plan of Survey shall not be granted until all As Constructed information has been
supplied and accepted by Council.
26. Any damage caused to any public utility during the course of construction shall be repaired to Council’s
standards and at no cost to Council.
27. Any alteration of any public utility or other facilities necessitated by this approval or associated
construction works internal or external to the site shall be the applicant’s responsibility and at no cost to
Council.
28. The transportation of all materials to and from the site shall be undertaken in a manner such that no
particle matter escapes onto a public road. All vehicles carrying materials either to or from the site shall
be covered to prevent materials including dust being windblown from the vehicle.
NSC c:\docume~1\rhr\locals~1\temp\bcl technologies\easypdf 5\@bcl@c80ef45d\@[email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - 010.2007.00000694.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 33 KB (small file)
- File type
No other editions are linked here.