Table 5 shows the mitigating effect of the OSD on the developed sites peak flows. The mitigated site
shall decrease peak stormwater flows (when compared with the existing site) for all design events.
Therefore ensuring that the downstream environment will not experience an increase in peak
stormwater flow from the proposed development.
Table 5 – Mitigated peak flow rates from the developed site
Peak Flow Rate (L/s)
AEP Storm
Event
Combined Existing Catchment Combined Mitigated Catchment
1EY 2610 1652
0.5EY 3837 2021
0.2EY 4239 2063
10% 5169 2281
5% 6397 3051
2% 7197 4734
1% 7786 5516
The developed site has changed the proportions of area draining to each of the LPOD. In the existing
case approximately 71.2% of the total site is considered to drain LPOD 1 with the remaining 28.9%
draining to LPOD 2. The developed case splits this with approximately 56.6% draining to LPOD 1,
16.5% draining to LPOD 2 and 26.9% draining to LPOD 2. Despite this the peak flows discharging to
each LPOD have not been increased for any event up to the 1% AEP event.
3. 5 W ate rw a y St ab il it y
The proposed development is proposed LPOD shall discharge to existing waterways within Cooroy golf
course. This triggers the need for waterway stability within Appendix 2 of the SPP. Table B of Appendix
2 of the SPP states that the design objective for waterway stability management shown below.
“Limit the peak 1-year ARI event discharge within the receiving waterway to the pre-development peak
1-year ARI discharge” – SPP Appendix 2 Table B.
As shown below in table 6 the proposed stormwater detention modelling has shown that the 63.2% AEP
event peak discharge (equivalent to 1 year ARI) has been reduced to each waterway. It is therefore
deemed that the development is meeting the waterway stability design objective.
Stormwater Management Report 11
S19-007 122 & 144 Myall St, Cooroy
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.