Table 6 – Individual mitigated catchment discharge
AEP Peak Flow Rate (L/s)
Storm
Event Existing Mitigated Existing Mitigated Existing Mitigated
Catchment 1 Catchment 1 Catchment 2 Catchment 2 Catchment 3 Catchment 3
1EY 1333 1179 432 68 915 374
0.5EY 1972 1453 579 71 1292 425
0.2EY 2173 1500 677 74 1471 451
3. 6 Cr iti c al St o rm Du r at i ons
The critical durations for each event (modelled using XPSTORM) for the existing, developed and
mitigated scenarios are presented below in table 6.
Table 7 – Critical Durations
Critical Duration
AEP Storm
Event
Existing Developed Mitigated
1EY 30 Minute 10 Minutes 30 Minute
0.5EY 10 Minute 10 Minutes 30 Minute
0.2EY 10 Minute 10 Minutes 30 Minute
10% 10 Minute 15 Minutes 30 Minute
5% 10 Minute 15 Minutes 30 Minute
2% 10 Minute 10 Minutes 30 Minute
1% 10 Minute 10 Minutes 30 Minute
Stormwater Management Report 12
S19-007 122 & 144 Myall St, Cooroy
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.