Original source · versioned page text
1909-13367 SRA referral response approved docs
Attached to the e-mail SARA Referral agency response – with conditions - MCU19/0114 & RAL19/0027.
Very large file (31.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Table 9 – Pollutant load reductions achieved
Mean annual % load reduction from unmitigated development
Pollutant
Required Achieved
Total Suspended Solids (TSS) 80 84 (+4.0)
Total Phosphorous (TP) 60 60.0 (+0.0)
Total Nitrogen (TN) 45 54.4 (+9.4)
Gross Pollutants>5mm (GP) 90 100 (+10.0)
The proposed treatment train exceeds all the required pollutant load reductions stipulated by NSC.
Refer Appendix AB for further MUSIC modelling details.
4. 3 Con st ruc t io n Ph a se
Management of stormwater run-off during construction is necessary to avoid pollution of downstream
waterways from sediment and gross pollutant loading. Pollutants typically generated during construction
phase are described in table 9.
Table 10 – Pollutants typically generated during the construction phase
Pollutant Sources
Litter (Gross Pollutants) Paper, construction packaging, food packaging, cement bags.
Sediment Unprotected exposed soils and stockpiles during earthworks and building.
Hydrocarbons Fuel and oil spills, leaks from construction equipment.
Toxic materials Cement slurry, asphalt prime, solvents, cleaning agents, wash waters.
pH altering substances Acid sulphate soils, cement slurry and wash waters.
Refer Table A in separate SPP Appendix 2 for further stormwater management design objectives that
are applicable to all climatic regions.
4.3.1 E ro sio n and Se di men t Co ntr ol
Impacts of inadequate erosion and sediment control downstream from the site include:
1. Traffic safety problems
2. Blocked drains
3. Local flooding problems
4. Aesthetic pollution of drainage paths, and
5. Damage to local ecosystems
Best practice erosion and sediment controls must be installed to minimise the discharge of sediment
laden run-off during construction.
Stormwater Management Report 15
S19-007 122 & 144 Myall St, Cooroy
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.