Original source · versioned page text
1909-13367 SRA referral response approved docs
Attached to the e-mail SARA Referral agency response – with conditions - MCU19/0114 & RAL19/0027.
Very large file (31.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.
CO NT E NT S
1 Introduction ............................................................................................................................ 6
2 Site Description ..................................................................................................................... 6
2.1 Location and Land Use ............................................................................................................ 6
3 Hydrology ............................................................................................................................... 7
3.1 Contributing catchment parameters ........................................................................................ 7
3.1.1 Catchment area ....................................................................................................................... 7
3.1.2 Fraction impervious ................................................................................................................. 9
3.1.3 Manning’s roughness ............................................................................................................... 9
3.1.4 Initial and continuing losses ................................................................................................... 10
3.1.5 Rainfall temporal patterns ...................................................................................................... 11
3.1.6 1D Hydraulic model layout ..................................................................................................... 11
3.1.7 Determination of critical storm duration ................................................................................. 12
3.1.8 Rational method ..................................................................................................................... 13
3.1.9 2D Modelling parameters....................................................................................................... 14
3.1.10 Developed Site Drainage ....................................................................................................... 21
4 2D Modelling Results .......................................................................................................... 23
4.1 4.1 Base Case Results .......................................................................................................... 23
4.1.1 50% Aep Existing Case Results (no blockage) ..................................................................... 23
4.1.2 20% Aep Existing Results (no blockage) ............................................................................... 24
4.1.3 10% Aep Existing Results (no blockage) ............................................................................... 24
4.1.4 5% Aep Existing Results (no blockage) ................................................................................. 24
4.1.5 2% Aep Existing Results (no blockage) ................................................................................. 24
4.1.6 1% Aep Results (no blockage) .............................................................................................. 24
4.1.7 1 in 500 Year Existing Results (no blockage) ........................................................................ 25
4.1.8 1 in 2000 Year Existing Results (no blockage) ...................................................................... 25
4.1.9 PMP Existing Results (no blockage) ..................................................................................... 25
4.2 Developed Case Results ....................................................................................................... 26
4.2.1 50% Aep Results (Developed no blockage) .......................................................................... 26
4.2.2 50% Aep Results (Developed with blockage) ....................................................................... 26
4.2.3 20% Aep Results (Developed no blockage) .......................................................................... 26
4.2.4 20% Aep Results (Developed with blockage) ....................................................................... 26
4.2.5 10% Aep Results (Developed no blockage) .......................................................................... 27
4.2.6 10% Aep Results (Developed with blockage) ....................................................................... 27
4.2.7 5% Aep Results (Developed no blockage) ............................................................................ 27
4.2.8 5% Aep Results (Developed with blockage).......................................................................... 27
4.2.9 2% Aep Results (Developed no blockage) ............................................................................ 27
4.2.10 2% Aep Results (Developed with blockage).......................................................................... 28
Flood Study 3
S19-007 122 & 144 Myall St, Cooroy
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.