Original source · versioned page text
1909-13367 SRA referral response approved docs
Attached to the e-mail SARA Referral agency response – with conditions - MCU19/0114 & RAL19/0027.
Very large file (31.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.
4.2.11 1% Aep Results (Developed no blockage) ............................................................................ 28
4.2.12 1% Aep Results (Developed with blockage).......................................................................... 29
4.2.13 1 in 500 Results (Developed no blockage) ............................................................................ 29
4.2.14 1 in 500 Results (Developed with blockage) ......................................................................... 30
4.2.15 1 in 2000 Results (Developed no blockage) .......................................................................... 30
4.2.16 1 in 2000 Results (Developed with blockage) ....................................................................... 30
4.2.17 PMP Results (Developed no blockage) ................................................................................. 30
4.2.18 PMP Results (Developed with blockage) .............................................................................. 30
4.3 Afflux Results and Discussion ............................................................................................... 30
4.3.1 50% Aep Afflux (no blockage) ............................................................................................... 31
4.3.2 50% Aep Afflux (with blockage) ............................................................................................. 31
4.3.3 20% Aep Afflux (no blockage) ............................................................................................... 31
4.3.4 20% Aep Afflux (with blockage) ............................................................................................. 31
4.3.5 10% Aep Afflux (no blockage) ............................................................................................... 31
4.3.6 10% Aep Afflux (with blockage) ............................................................................................. 31
4.3.7 5% Aep Afflux (no blockage) ................................................................................................. 31
4.3.8 5% Aep Afflux (with blockage) ............................................................................................... 32
4.3.9 2% Aep Afflux (no blockage) ................................................................................................. 32
4.3.10 2% Aep Afflux (with blockage) ............................................................................................... 32
4.3.11 1% Aep Afflux (no blockage) ................................................................................................. 33
4.3.12 1% Aep Afflux (with blockage) ............................................................................................... 34
5 Conclusion ........................................................................................................................... 35
6 Appendices ..............................................................................................................................
6.1 Appendix BA – Catchment Layout ........................................................................................ BA
6.2 Appendix BB – Reporting points and flow line locations ...................................................... BB
6.3 Appendix BC – Flood Maps and Afflux Maps ....................................................................... BC
6.4 Appendix BD – ARR DataHub Data ..................................................................................... BD
6.5 Appendix BE – Adopted Bridge Cross Sections ................................................................... BE
6.1 Appendix BF – 1D Blockage Locations ................................................................................ BF
FIG U R E S
Figure 1 – Indicative Site location and property boundary (NearMap 2019) ................................ 7
Figure 2 – External catchment extents (image from nearmap 2019) ........................................... 8
Figure 3 – 1D model layout (Image from NearMap 2019) .......................................................... 12
Figure 4 – 2D model grid extents ............................................................................................... 16
Figure 5 – 2D Flow Lines ............................................................................................................ 17
Flood Study 4
S19-007 122 & 144 Myall St, Cooroy
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.