Original source · versioned page text
1909-13367 SRA referral response approved docs
Attached to the e-mail SARA Referral agency response – with conditions - MCU19/0114 & RAL19/0027.
Very large file (31.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Figure 6 – 2D Flow Lines ............................................................................................................ 18
Figure 7 – Head/Velocity Locations ............................................................................................ 20
Figure 8 – Developed Catchment Breakdown............................................................................ 23
Figure 9 – 1% AEP existing flood depths extract. ...................................................................... 25
Figure 10 – 1% AEP Developed flood depths extract. ............................................................... 29
Figure 11 – Proposed Bridge Cross section (taken as the natural channel cross section for the
span of the bridge taken up to the underside of the bridge structure) .................................. 1
Figure 12 – Existing Rail Bridge (Item 2 in table 6 of above report) ............................................. 2
Figure 13 – Existing Miva St Crossing (Item 6 in table 6 of above report) ................................... 2
T AB LE S
Table 1 – Existing catchment details (refer figure 2 and Appendix BA) ....................................... 9
Table 2 – 2D Landuses ............................................................................................................... 10
Table 3 –Critical 1D peak flow rates and critical storms (XPStorm) ........................................... 13
Table 4 – Time of concentration summary ................................................................................. 14
Table 5 – Blockage factor risk assessment ................................................................................ 19
Table 6 – Blockage percentage (design AEP) for existing and proposed 1D elements ............. 19
Table 7 – Developed catchment details (refer figure 8 and Appendix BA) ................................. 22
Flood Study 5
S19-007 122 & 144 Myall St, Cooroy
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.