Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

1909-13367 SRA referral response approved docs

Attached to the e-mail SARA Referral agency response – with conditions - MCU19/0114 & RAL19/0027.

of 146

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (31.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Flows approaching the development site from the south-west (Myall St and the Bruce highway) begin
to overtop the proposed intersection of Myall St and the proposed bridge during this event. The
maximum depth of flow across the intersection is approximately 0.05m.


4.2.10 2 % Ae p Re su lt s ( D ev elo pe d w ith bl oc k ag e )

The peak water level during the above event at reporting point 1 was 106.44m AHD. The peak water
level at point 2 is 105.14m AHD. The results at points 1 and 2 show a decrease of 0.03m at point 1 and
0.01m at point 2.
The peak flow at flow line 10 was 41.28m3/s.

The above peak flow is as per the above case without blockage.


4.2.11 1 % Ae p Re su lt s ( D ev elo pe d n o b lo ck ag e)

The peak water level during the above event at reporting point 1 was 106.52m AHD. The peak water
level at point 2 is 105.18m AHD. Point 1 shows no change in peak water elevation. Point 2 shows a
decrease in peak water elevation of 0.03m.

The peak flow at flow line 10 was 44.13m3/s.

This is 2.73m3/s less than the existing case. The above peak water elevation results indicate that the
bridge is not creating a worsening upstream.

Flows approaching the site from the south-west overtop the intersection of Myall St and the proposed
entry way to the development site. The maximum depth of flow across this intersection is approximately
0.05m.

The developed 1% AEP model peak water depth is presented in figure 9 below. See Appendix BC for
all design flood maps.




                                              Flood Study                                          28
S19-007                                122 & 144 Myall St, Cooroy
Log in to download the original file

1909-13367 SRA referral response approved docs.pdf · 31.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.