Eco Access Response - Attached to Change to an Existing Approval · 142008.1704.4

of 7

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

ecoaccess

environmental licences and permits .
Notice
Change to an existing approval

 

 

 

 

3. The Approved Plans

The approved plans and/or documents for this approval are listed in the following table —
Plan/Document No. | Plan/Document Name Date
WD.707 C12 Proposed Pontoon and Jetty March 2007

Pool Edge / Bank Study
Pool Edge / Bank Elevation
Jetty Perspective 090730

By Kidd + Co. drawn by LF/EW

 

 

 

 

3. Conditions of Approval
The IDAS concurrence agency and response to the application (attached) is:

1. The regatta stairs in this proposal are planned to encroach upon an underlying tidal waterway rock
revetment wall which is designed to provide protection from coastal processes. The regatta stairs as
previously approved have been considered acceptable temporary or expendable non-maritime structure
for safety or recreational purposes as part of this pontoon and jetty development. Should the underlying
protective rock wall require maintenance or repair for the protection of life and property the regatta stairs
may be required to be removed. This requirement is in accordance with section 2.2 of the State Coastal
Management Plan — Queensland's Coastal Policy 2001 principles 2A — 2E that ‘The coast is managed to
allow for natural fluctuations to occur, including any that occur as a result of climate change and sea level
rise, and provide protection for fife and property’.

2. The regatia stair total dimensions must remain unchanged and meet the previously approved dimensions
provided in WD.202 C4 “Jetty Layout 2 of 2” and WD.710 C1 “Water Allocation Plan”

3. The structural integrity, operation and maintenance of the existing tidal waterway rock revetment wall
must not to be affected by the works or the development.

4. You must remove any material that is deposited outside of the alignment of the works shown on the
approved plans or any debris that falls or is deposited on tidal lands or into tidal waters during the
construction of the works.

3. No CCA treated timber Is to be used on these works until all external surfaces are dry from the CCA
treatment process. All treated timber is to be sawn or drilled over a catchment sheet and all offcuts are to
be disposed of to an approved landfill site.

4. You must ensure that all appropriate measures are taken to prevent the pollution of tidal waters as a result
of silt runoff, oil and grease spills from machinery, concrete truck washout and alike. Concrete agitator wash
out must only be conducted in a specified area to facilitate the removal of waste concrete from the area to
landfill. Wastewater from cleaning equipment shall not discharge directly or in-directly to any watercourse or
stormwater system.

 

Page 2 of 7 * ADO80709 Department of Environment and Resource Management

 

Used in these records

About this file

File size
339 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Eco Access Response - Attached to Change to an Existing Approval.pdf · 339 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.