Minor Change Existing Approval - MCU24 0143 01 (As Published)

of 8
                      Easements
               27.    Unless otherwise agreed in writing by the relevant service provider, any public or third party
                      infrastructure located on the subject site must be placed within an easement registered
                      against the title of the property.
               28.    All easements must be designed in accordance with the planning scheme and granted at no
                      cost to the Grantee. Where the Grantee is Council or a service authority, the easement
                      documentation must be in accordance with the Grantee’s standard easement terms. Draft
                      easement documentation must be submitted to Council for endorsement.
               29.    All works must be kept clear of any existing or proposed easements on the subject land,
                      unless agreed otherwise in writing by the Grantee.
                      Geotechnical Stability
               30.    All works must be carried out in accordance with the recommendations contained in a revised
                      version of Tectonic’s Slope Stability Assessment (24378-001-Rev1) which is amended to
                      reflect the revised cabin and siting location. Certification must be provided to the Building
                      Certifier that the development achieves a minimum factor of safety against landslip of 1.5 in
                      the long term.
                      (*) Refer to Advisory Note
                      Earthworks and Retaining Walls
               31.    All earthworks must be supervised by a Registered Professional Engineer of Queensland
                      (RPEQ).
               32.    All earthworks and associated foundations/footings, retaining structures/batters, both above
                      and below ground level and both temporary and permanent, must be contained entirely within
                      the subject site unless written permission from the respective landowner(s) is provided to
                      Council. All earthworks must be undertaken in accordance with the provisions of Australian
                      Standard AS3798: Guidelines on Earthworks for Commercial and Residential Developments.
               33.    Earthworks carried out on site must not affect the structural integrity of any of the adjoining
                      lands and/or buildings and/or structures and/or services.
                      Damage to Services and Assets
               34.    Any damage caused to existing services and assets as a result of the development works
                      must be repaired at no cost to the asset owner at the following times:
                      a.      where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
                              or
                      b.      where otherwise, upon completion of the works associated with the development.
                      Any repair work which proposes to alter the alignment or level of existing services and assets
                      must first be referred to the relevant service authority for approval.
                      Additional Condition – 26 August 2026 - MCU24/0143.01
               35.    The development is to be staged with:
                      a)      The northern cabin (Cabin 1) to be delivered as Stage 1; and
                      b)      The southern cabin (Cabin 2) to be delivered as Stage 2.
               5.     REFERENCE DOCUMENTS

                Plan No.               Rev.   Plan/Document Name                                    Date

                24378-001              1      “Slope Stability Assessment”                          4 June 2025
                                              Prepared by Tectonic




                                                                                                        Page 5 of 8
Document Set ID: 25104812
Version: 5, Version Date: 02/09/2026

Log in to download the original (Minor Change Existing Approval - MCU24 0143 01 (As Published).pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.