TIA - Application decision - s62A (PA) - Approval_1
Attached to the e-mail SARA application correspondence - Response - MCU24/0144.
No. Conditions of Approval Condition Timing
2 Road Access Works comprising a minimum 6 meter wide Vehicle Prior to the commencement
Crossing – Heavy Duty must be provided at the permitted access of the use of the Road
location, generally in accordance with: Access Works and to be
i. Institute of Public Works Engineering Australia (IPWEA), maintained at all times.
Heavy Duty Property Access, dated 07/2023, Standard
Drawing RSD-102, Rev A.
ii. Department Transport and Main Roads' Road Planning
and Design Manual;
iii. Queensland Manual of Uniform Traffic Control Devices;
and,
iv. Sight Distance Layout Plan, prepared by Bax Engineering,
dated 3 Feb 2024, drawing number 460-001-900, revision
B.
3 The permitted road access and driveway on the state-controlled At all times.
road must maintain clear sight lines, free from any potential
obstacles, including but not limited to fencing, structure, signage,
or vegetation, for all footpath users. This must be in accordance
with Section 3.2.2 “Sight distance requirements at driveways” of
the Guideline on Treatment Options to Improve Safety of
Pedestrians, Bicycle Riders, and Other Path Users at Driveways,
published by the Department of Transport and Main Roads in
February 2021.
4 The existing Road Access Works situated between Cooroy Prior to completion of Road
Connection Road and Lot 27C5605 must be removed and all kerb Access Works for new
and channel and concrete footpath reinstated between the permitted road access
pavement edge and the property boundary in accordance with the location.
surrounding environment.
5 Direct access is prohibited between Cooroy Connection Road and At all times.
Lot 27C5605 at any other location other than the Permitted Road
Access Location described in Condition 1.
Reasons for the decision
The reasons for this decision are as follows:
a) To ensure the road access locations do not compromise the safety and efficiency of the
state-controlled road.
b) To ensure that development does not create a safety hazard for users of a state-
controlled road.
Please refer to Attachment A for the findings on material questions of fact and the evidence or
other material on which those findings were based.
Information about the Decision required to be given under section 67(2) of TIA