                        c.      The driveway within the road reserve must be constructed of an approved
                                pavement type.
                        d.      The works must not adversely impact on existing natural vegetation and trees.
                        e.      The works must include any necessary reinstatement of disturbed vegetation
                                along the shoulders of the driveway.
                        f.      All necessary stormwater drainage control measures must be provided so as not
                                to concentrate stormwater runoff or cause erosion on adjoining lands.
                 13.    Pavement design for privately owned works within the road reserve must be undertaken
                        in accordance with the relevant standards and must be certified by an RPEQ.
                 14.    All pavements within the road reserve must have a slip resistant surface.
                        Stormwater Drainage
                 15.    The development works must not to cause additional ponding of water on any adjoining
                        lands or concentrate or direct overland flow to an adjoining property.
                        Erosion and Sediment Control
                 16.    Sediment and erosion control measures must be in place prior to works commencing
                        and for the duration of construction *. The site Supervising Engineer is responsible for
                        ensuring that the sediment and erosion control measures have:
                        a.      Been duly designed by an RPEQ or CPESC and constructed in accordance with
                                "best practise" methods,
                        b.      Been revised by an RPEQ or CPESC to address the issues raised by changes in
                                the projected construction schedule and/or methods,
                        c.      Been revised to address predicted rainfall events,
                        d.      Achieve the desired environmental outcomes, and
                        e.      Are maintained until site stabilisation has been established.
                        Council may request further controls to be installed should the implemented measures
                        be found inefficient.
                 17.    The developer must ensure non-essential exposure of soil is prevented by restricting the
                        extent of disturbance and minimising the duration of soil exposure to adverse weather
                        conditions and effectively turf, cover or stabilise any disturbed area without delay and
                        prior to rainfall occurring.
                 18.    Sediment must not leave the site or enter onto adjoining properties or Council’s drainage
                        system due to surface runoff or on tyres of vehicles and/or machinery. It is essential to
                        implement appropriate approved erosion and sediment control measures throughout the
                        site during all phases of construction including vehicle shakedown pad/grid (or similar)
                        at the access to the construction site. Where sediments or other contaminants are
                        deposited on a road, they must be removed so as not to enter Council’s drainage system
                        or waterways.
                 19.    Prior to the completion of the development and commencement of use, all site surfaces
                        must be effectively stabilised using methods which have achieved effective short-term
                        stabilisation and which will continue to achieve effective stabilisation in the medium to
                        long-term. For the purpose of this condition, an effectively stabilised surface is defined
                        as one that does not, or is not likely to result in visible evidence of soil loss caused by
                        sheet, rill or gully erosion or lead to sedimentation, or lead to water contamination.
                        Damage to Services and Assets
                 20.    Any damage caused to existing services and assets as a result of the development
                        works must be repaired at no cost to the asset owner at the following times:




                                                                                                           Page 4 of 6
Document Set ID: 23371116
Version: 5, Version Date: 26/11/2024

Used in these records

About this file

File size
112 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Referral Agency Response - Minor Change - Planning RAP20 0037 01.pdf · 112 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.