Council archive · source document
Subdivision Decision Notice · OPW16/0051
Attached to the e-mail OPW16/0051 - Operational Works Application (REC15/0023).
REC15/0023 Approved Plans 2. Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Rev. Plan/Document Name Date 15-3983AI Plan of Proposed Reconfiguration of Lot NA 23-12-15 70 on RP217095, prepared by Max Watterson + Associates 3. All lot numbering on the subdivision plan to be submitted to Council for compliance assessment must remain as shown on the Approved Plans. 4. The development must be undertaken and operated in a manner that causes no detrimental effect upon the amenity of the neighbourhood by reason of the creation of excessive noise, lighting nuisance or other emissions. ENGINEERING Stormwater Drainage 5. The existing Council’s stormwater drainage pipeline on the property must be reconstructed to be centrally located within the proposed 3.0m wide drainage easement shown on the approved lot reconfiguration plan. The works must be undertaken in accordance with an Operational Works approval in compliance with the relevant sections of Queensland Urban Drainage Manual and supported by a detailed stormwater drainage design prepared and certified by a suitably qualified and experienced Registered Professional Engineer Queensland (RPEQ). The works must generally include: (a) The replacement and upgrade of the entre length of the pipeline between the upstream sealed connection pit in Ravenwood Drive and the existing downstream outlet. (b) The removal of the redundant existing pipeline. (c) The reconstruction of the existing kerb inlet pit. (d) Catering for any existing or required stormwater connection/s into the pipeline. (e) Any adjustment to existing public service may be necessitated by the pipeline replacement. (f) Any road pavement and frontage reinstatement works associated with proposed stormwater pipeline works. These stormwater drainage works are “non-trunk infrastructure” for the purposes of the Sustainable Planning Act 2009. Easements 6. A stormwater drainage easement 3.0m wide minimum must be created in favor of Council centrally located over the constructed new stormwater pipeline and structure/s within the site and generally in accordance with the approved lot reconfiguration plan. 7. Unless otherwise agreed in writing by the relevant service provider, any public or third party infrastructure located on the subject site must be placed within an easement registered against the title of the property and in accordance with the requirements of the respective service provider. Page 2 of 7 Document Set ID: 20006723 Version: 1, Version Date: 07/01/2016 Print Date: 7 January 2016, 2:28 PM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Subdivision Decision Notice.pdfRelated documentApplication case desk ↗
Subdivision Decision Notice.pdfRelated documentApplication case desk ↗
About this file
- File size
- 582 KB (small file)
- File type
No other editions are linked here.