13.4 Subcontractors
The Project Sponsor must ensure that any subcontract entered into by it in relation
to this Agreement places the same obligations about Personal Information on the
subcontractor as this clause 13 places on the Project Sponsor.
14. Proportionate liability
The provisions of Part 7A of the Civil Law (Wrongs) Act 2002 (ACT) (and its
equivalents in other states and territories) apply to a claim in any way connected
with the Project or this Agreement, whether arising in contract, tort (including
negligence), bailment or otherwise.
15. Insurance
15.1 Obligation to take out and maintain insurance
(a) Subject to clause 15.1(b), the Project Sponsor must take out or have taken
out for the period specified in clause 15.1(c) or clause 15.1(d) (as the case
may be) as at the Commencement Date:
(i) | workers’ compensation insurance to the extent required by Law;
(ii) | general and products liability insurance; and
(iii) | professional indemnity or errors and omissions insurance,
as specified in Item 7 of the Agreement Details.
(b) Where the property owners or property managers have or will take out
general and products liability insurance in respect of the Site, the Project
Sponsor must ensure that:
(i) | the insurance complies with the requirements of this clause 15; and
(ii) | the Project Sponsor is able to obtain copies of the current insurance
policies and certificates of currency.
(c) If the Project Sponsor takes out a ‘claims made’ policy, which requires all
claims and any fact situation or circumstance that might result in a claim to be
notified within the period of insurance, the Project Sponsor must maintain the
policy (or a policy in like terms) during the Agreement Period and for a period
of seven years on and from the expiry or the early termination of this
Agreement.
(d) If the Project Sponsor takes out an ‘occurrence’ policy, which requires the
circumstances to which a claim relates to occur during the period of insurance
whilst the notification of event can occur at any time subsequently, the Project
Sponsor must maintain the policy during the Agreement Period.
(e) The Project Sponsor must ensure that any subcontract entered into by the
Project Sponsor in relation to this Agreement places on the subcontractor, in
respect of the subcontractor’s activities, the same or similar obligations about
insurances, as this clause 15 places on the Project Sponsor.
15.2 Copies of insurance
The Project Sponsor must, on request, promptly provide to the Service Provider any
relevant insurance policies and certificates of currency for inspection.
Green Army Project Agreement in relation to Managing weed threats from bushland reserves and coastal habitats in Noosa LGA.
Project ID B0270003901G TEM5191 issued 09/04/2015 page 24See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.