SC-8407 – 45 Maple Street, Cooroy                                                            10


4.4      Modelling Results
A node layout plan is included in Appendix B of this report and the resultant peak flow rates are displayed
in Table 4.3 & 4.4.

                                                                  3
                                                   Peak Flow (m /s)
                                    AEP (%)
                                                   Pre Development

                                    50 (Q2yr)       0.093 (30min_1)

                                    20 (Q5yr)       0.137 (20min_10)

                                    10 (Q10yr)      0.166 (30min_3)

                                    5 (Q20yr)       0.194 (30min_3)

                                    2 (Q50yr)       0.222 (15min_8)

                                    1 (Q100yr)      0.245 (15min_8)

                            Table 4.3 – Pre-Development Peak Flow Rate Results


                                                                  3
                                                   Peak Flow (m /s)
                                    AEP (%)
                                                   Post Development

                                    50 (Q2yr)       0.082 (20min_10)

                                    20 (Q5yr)       0.120 (10min_5)

                                    10 (Q10yr)      0.132 (30min_3)

                                    5 (Q20yr)       0.151 (30min_3)

                                    2 (Q50yr)       0.161 (15min_8)

                                    1 (Q100yr)      0.175 (15min_8)

                      Table 4.4 – Post-Development (mitigated) Peak Flow Rate Results


As can be seen in Tables 4.3 & 4.4 the post-development peak flow rates to the existing drainage system
compare well to that of the existing pre-development site discharges. This is due to the large volumes of
on-site detention proposed to be included as part of the development.

Log in to download the original (Stormwater Mgmt Plan.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.