Stormwater Mgmt Plan
SC-8407 – 45 Maple Street, Cooroy 10
4.4 Modelling Results
A node layout plan is included in Appendix B of this report and the resultant peak flow rates are displayed
in Table 4.3 & 4.4.
3
Peak Flow (m /s)
AEP (%)
Pre Development
50 (Q2yr) 0.093 (30min_1)
20 (Q5yr) 0.137 (20min_10)
10 (Q10yr) 0.166 (30min_3)
5 (Q20yr) 0.194 (30min_3)
2 (Q50yr) 0.222 (15min_8)
1 (Q100yr) 0.245 (15min_8)
Table 4.3 – Pre-Development Peak Flow Rate Results
3
Peak Flow (m /s)
AEP (%)
Post Development
50 (Q2yr) 0.082 (20min_10)
20 (Q5yr) 0.120 (10min_5)
10 (Q10yr) 0.132 (30min_3)
5 (Q20yr) 0.151 (30min_3)
2 (Q50yr) 0.161 (15min_8)
1 (Q100yr) 0.175 (15min_8)
Table 4.4 – Post-Development (mitigated) Peak Flow Rate Results
As can be seen in Tables 4.3 & 4.4 the post-development peak flow rates to the existing drainage system
compare well to that of the existing pre-development site discharges. This is due to the large volumes of
on-site detention proposed to be included as part of the development.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Stormwater Mgmt Plan.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.