Original source · versioned page text
Stormwater Mgmt Plan
SC-8407 – 45 Maple Street, Cooroy 11
5.0 Flood Hazard Overlay and External Catchment
The subject site is not affected by regional flooding impacts.
6.0 Conclusions
This report has outlined a total water cycle strategy to be adopted in the construction and operational
works phase of the development which satisfies State and Council planning scheme policies.
Rainwater harvesting and re-use is adopted to reduce the demand on Council’s existing
infrastructure;
Best practice and practical water quality improvement methods;
60kL of peak flow mitigation volume is required of the development; and
Formalisation of drainage regimes in accordance with QUDM including inter-allotment drainage
and dedicated drainage easements.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Stormwater Mgmt Plan.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.