Skip to the record
Search everything, all in one place.

Original source · versioned page text

Stormwater Mgmt Plan

of 27

Page text read automatically using OCR, there may be inaccuracies

SC-8407 – 45 Maple Street, Cooroy                                                            11



5.0 Flood Hazard Overlay and External Catchment
The subject site is not affected by regional flooding impacts.




6.0 Conclusions
This report has outlined a total water cycle strategy to be adopted in the construction and operational
works phase of the development which satisfies State and Council planning scheme policies.


        Rainwater harvesting and re-use is adopted to reduce the demand on Council’s existing
         infrastructure;
        Best practice and practical water quality improvement methods;
        60kL of peak flow mitigation volume is required of the development; and
        Formalisation of drainage regimes in accordance with QUDM including inter-allotment drainage
         and dedicated drainage easements.

Log in to download the original (Stormwater Mgmt Plan.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.