7.3.3 MUSIC Model Results
The results of the MUSIC model are shown in Table 7.3.3a below.
Table 7.3-3a Treatment Train Effectiveness
Flow TSS TP TN Gross
ML/y Kg/y Kg/y Kg/y Pollutant
Kg/y
Source Load 6.62 1090 2.25 13.8 134
Residual Load 6.27 189 0.891 7.21 5.51
% Reduction 5.2 82.6 60.3 47.7 95.9
% Target Reduction - 80 60 45 90
Inspection of Table 7.3.3a shows that the target pollutant load reductions have been
achieved for the site.
Refer to the attached MUSIC Model data file (Appendix D) for preliminary details. It is
anticipated that detailed design of the water quality treatment devices will be undertaken
as part of future Operational Works applications.
7.3.4 Maintenance of WSUD Devices
The proposed water quality treatment devices and rainwater harvesting tanks will be
privately owned and maintained. A detailed Operational Phase Maintenance Plan will be
prepared as part of future Operational Works applications.
16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 4a - Engineering Report Part 1.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.