SUPERSEDED - Decision Notice - Approved by Delegation of Authority DBW24 0122 (As Published) · DBW24/0122
c. Be requested for release by writing to Council, when relevant approval requirements
have been met.
Earthworks
8. All earthworks and associated retaining structures/batters must be contained entirely within
the subject site unless written permission from the respective landowner(s) is provided to
Council. All earthworks must be undertaken in accordance with the provisions of Australian
Standard AS3798: Guidelines on Earthworks for Commercial and Residential Developments.
9. Earthworks carried out on site must not affect the structural integrity of the revetment wall,
existing fences or other structures that border the subject site. Fences that are affected must
be replaced in a timely manner and in consultation and agreement of the owners of the
related properties.
Revetment Wall / Flood Storage
10. All works within the 4.5m setback from the revetment wall must be carried out generally in
accordance with Linday Consulting’s Flood Storage Model Site Plan (24-1071-F1, Rev. A)
and Flood Storage Model Perspective Model (24-1071-F2, Rev. A) dated 29 December 2024.
11. All works for the purpose of increasing available flood storage must be located within the
4.5m setback from the revetment wall.
12. Certification of the completed works within the 4.5m setback from the revetment wall must
be submitted to Council within 3 months of the completion of the works. The certification must
be prepared by a RPEQ (Registered Professional Engineer of Queensland) and state that
the works:
(a) Have not reduced the amount of available flood storage within the 4.5m setback from the
revetment wall;
(b) Have not negatively impacted the stability of the revetment wall or negatively impacted
the associated membrane;
(c) Have not reduced the available flood storage within the lot from the profile as described
in The Noosa Plan 2020 – Low Density Residential Zone Code; and
(d) Meet the relevant conditions of this approval.
Stormwater Drainage
13. Stormwater runoff from the development must be discharged to Masthead Quay or disposed
of on-site without causing scour or damage to the subject site or any adjoining property.
Damage to Services and Assets
14. Any damage caused to existing services and assets as a result of the development works
must be repaired at no cost to the asset owner at the following times:
a. Where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
or
a. Where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and assets
must first be referred to the relevant service authority for approval.
Demolition of Building
Codes of Development
15. Unless specifically conditioned otherwise, all works must comply with the relevant acceptable
solutions as contained in the Waste Management Code and Water Quality and Drainage
Code of the Noosa Plan 2020.
Page 3 of 7