Amended Condition 41
41. A minimum of 55 50 car parking spaces must be provided and marked on the site. The works must be
undertaken in accordance with an Operational Works approval, be generally in accordance with Blackburne
Jackson’s Site Plan – Wedding Venue (DA03, Rev. 06) dated 30 July 2024 and must include in particular:
a. 4 staff parking spaces within the total, which are clearly marked for that purpose;
b. pedestrian routes in accordance with the conditions of this Decision Notice;
c. 2 coach parking spaces, which are clearly marked for that purpose;
d. 1 disabled parking space/s within the total; and
e. dimensions, crossfalls and gradients in accordance with Australian Standard AS2890: Parking Facilities.
Condition 45
Pedestrian and Bicycle Facilities
45. Pedestrian and bicycle facilities must be provided for the development, as noted below. The works must be
undertaken in accordance with an operational works approval and must include in particular:
a. pedestrian pathways between the proposed car parking area and the building/s; and
b. adequate separation of all specific pedestrian routes from vehicle access and manoeuvring areas, and
clear demarcation by pavement marking, signposts or changes in surface materials or levels.
c. a minimum of 7 visitor bicycle parking spaces, in accordance with AS 2890.3 – Bicycle parking.
Comment
Considering the location and the nature of the proposed use, it is not envisaged that guests or staff will be attending any
functions on a bicycle, and as such, it is respectfully requested that this requirement be deleted. Furthermore, there is
no bicycle path network constructed along Louis Bazzo Drive. Therefore, riding to the venue would be considered unsafe
and will not be included as part of the operational management plan for safety reasons.
Amend Condition 45
45. Pedestrian and bicycle facilities must be provided for the development, as noted below. The works must be
undertaken in accordance with an operational works approval and must include in particular:
a. pedestrian pathways between the proposed car parking area and the building/s; and
b. adequate separation of all specific pedestrian routes from vehicle access and manoeuvring areas, and
clear demarcation by pavement marking, signposts or changes in surface materials or levels.
c. a minimum of 7 visitor bicycle parking spaces, in accordance with AS 2890.3 – Bicycle parking.
Condition 46
Stormwater Drainage
46. The site must be provided with a stormwater drainage system connecting to a lawful point of discharge. The
works must be undertaken in accordance with an Operational Works approval and be generally in accordance
with Morgan Consulting’s Site Based Stormwater Management Plan (SBSMP, Rev. 2) dated 26 June 2024, and
must include in particular:
a. An assessment (and upgrade, if deemed necessary) of the interface between the existing dam drainage
outlet and the proposed fire egress road.
JFP Ref: M3155P Page 8
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (20250212-NC- Change representations to the decision notice.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.