Original source · versioned page text
MCU25 0079 - Negotiated Reference Documents (As Published)
Very large file (23.4 MB): the original may take a few minutes to open or download. The page text below is quick to read.
CO NT E NT S
1 INTRODUCTION ..................................................................................................................... 1
2 SITE DESCRIPTION ............................................................................................................... 1
2.1 Location and Land Use ............................................................................................................ 1
2.2 Lawful Point of Discharge ........................................................................................................ 2
2.3 Upstream Drainage Connection .............................................................................................. 2
2.4 Flooding ................................................................................................................................... 2
3 STORMWATER QUANTITY MANAGEMENT ........................................................................ 2
3.1 Existing Catchment .................................................................................................................. 2
3.1.1 DRAINS results for existing site .............................................................................................. 3
3.2 Developed Site ........................................................................................................................ 3
3.2.1 DRAINS results for developed site .......................................................................................... 4
3.3 Water Quantity Comparison .................................................................................................... 4
4 WATER QUALITY MANAGEMENT ....................................................................................... 5
4.1 Operational Phase ................................................................................................................... 5
4.2 Construction Phase ................................................................................................................. 5
4.2.1 Design Objectives .................................................................................................................... 6
4.2.2 Erosion and Sediment Control ................................................................................................. 8
4.2.3 Maintenance and Monitoring Requirements ............................................................................ 9
5 CONCLUSION ....................................................................................................................... 10
6 APPENDICES ..................................................................................................................... A-1
Appendix A – Erosion Hazard Assessment ........................................................................................ A-1
Appendix B – Engineering Drawings .................................................................................................. B-1
Appendix C – Site Survey & Architectural Drawings .......................................................................... C-1
iii
Document Set ID: 23959990
Version: 1, Version Date: 23/07/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.