Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

MCU25 0079 - Negotiated Reference Documents (As Published)

of 58

Page text shows just the words. Original shows the document exactly as it was published.

Very large file (23.4 MB): the original may take a few minutes to open or download. The page text below is quick to read.

                 List of Tables

                 Table 1 - Existing site peak flow rates. ................................................................................................... 3

                 Table 2 - Developed site peak flow rates. ............................................................................................... 4

                 Table 3 - Existing vs developed peak flow rates ..................................................................................... 5

                 Table 4 – Pollutants Typically Generated During the Construction Phase ............................................. 5

                 Table 5 – SPP Appendix 2: Part 1 Construction Phase – Stormwater Management Design Objectives
                 ................................................................................................................................................................ 6

                 Table 6 – SPP Appendix 2: Part 2 Construction Phase – Stormwater Management Design Objectives
                 for Temporary Drainage Works ............................................................................................................... 7

                 Table 7 – SPP Appendix 2: Part 3 Construction Phase – Stormwater Management Design Objectives
                 for Emergency Spillways on Temporary Sediment Basins ..................................................................... 8

                 Table 8 - ESC maintenance requirements. ........................................................................................... 10


                 List of Figures

                 Figure 1 – Indicative site location (Nearmaps, 2019) ............................................................................. 1




                                                                                                                                                                                iv
Document Set ID: 23959990
Version: 1, Version Date: 23/07/2025
Log in to download the original file

MCU25 0079 - Negotiated Reference Documents (As Published).pdf · 23.4 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.