Original source · versioned page text
Civil Engineering Report
Original PDF page 59, section 1. The text section number identifies this passage in the reader.
WATER QUALITY & DRAINAGE CODE Performance Criteria and Acceptable Solution 23 Bottlebrush Avenue, Noosa Head 22 May 2025 PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES RESPONSE PO12 AO12.1 No increase in peak runoff from site will occur Development protects in-stream ecology by Where run-off from or within the site passes as part of the proposed development. Refer maintaining pre-development low flow through or drains to natural Stormwater Management Plan for further discharge regimes and maintaining fish channels, waterways or wetlands, development information. passages. protects in-steam ecology by maintaining pre- development low flow discharge regimes in accordance with the frequent flow management objectives in PSP6 Engineering Design Standards - Roads, drainage and earthworks AO12.2 Instream structures such as roads, bridges, culverts, and other stormwater infrastructure do not cause barriers to fish passage and facilitate the movement of terrestrial and aquatic fauna along waterway corridors. AO12.3 Benthic substrate retains a continuous grade with the direction of flow consistent with the natural bed profile. https://mpncnetau.sharepoint.com/sites/administration/shared documents/10000-10999/10200-10299/10256/codes/22-05-25 water quality & drainage code_issue a.docx Page 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Civil Engineering Report.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.