Original source · versioned page text
Civil Engineering Report
Original PDF page 60, section 1. The text section number identifies this passage in the reader.
WATER QUALITY & DRAINAGE CODE Performance Criteria and Acceptable Solution 23 Bottlebrush Avenue, Noosa Head 22 May 2025 PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES RESPONSE PO13 AO13.1 Development will comply. Refer Stormwater Development is designed and constructed to The location and form of stormwater discharge Management Plan for further information. maintain surface and ground water balances points do not alter the pre-development that sustain the environmental values of water hydrology of receiving surface water or dependent ecosystems, including downstream groundwater. aquatic, riparian, wetland and terrestrial ecosystems. AO13.2 Developments located on groundwater recharge or discharge areas are designed and managed in accordance with a groundwater recharge and discharge management plan prepared by a suitably experienced and qualified groundwater hydrologist. The groundwater recharge or discharge must demonstrate that the development does not affect groundwater balances beyond the property boundaries. Editor's Note - PSP6 Engineering Design Standards - Roads, drainage and earthworks provides guidance on prepare a groundwater recharge and discharge plan. https://mpncnetau.sharepoint.com/sites/administration/shared documents/10000-10999/10200-10299/10256/codes/22-05-25 water quality & drainage code_issue a.docx Page 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Civil Engineering Report.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.