Civil Engineering Report
Original PDF page 65, section 1. The text section number identifies this passage in the reader.
EARTHWORKS CODE Performance Criteria and Acceptable Solution 23 Bottlebrush Avenue, Noosa Head. 22 May 2025 PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES RESPONSE Drainage PO1 AO1 RO1 Finished surface levels ensure land is free The finished surface gradient of any filled or Development complies with the acceptable draining. excavated area is within the range 0.5% to 1.5% outcome and will be free draining. and drains to Council’s stormwater infrastructure where available or where stormwater infrastructure is not available, toward the street. Hydraulics PO2 AO2 RO2 Any change to the level of the land does not No solution provided. Any ground level changes will not impact on have an adverse flooding impact on the site flooding or drainage characteristics. flooding and drainage characteristics off-site. Geotechnical considerations PO3 For assessable development— RO3 Earthworks do not result in geotechnical AO3.1 Earthworks completed on site will be instability on the premises or nearby premises. adequately supported and ensure the stability Filling works are undertaken in accordance with of the surrounding land Section 2.8- Filling of Site of Council’s PSP5 - Engineering Design Standards- Roads and Drainage & Earthworks AND https://mpncnetau.sharepoint.com/sites/administration/shared documents/10000-10999/10300-10399/10306/codes/22-05-25 earthworks code_issue a.docx Page 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Civil Engineering Report.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.