Civil Engineering Report
Original PDF page 66, section 1. The text section number identifies this passage in the reader.
EARTHWORKS CODE Performance Criteria and Acceptable Solution 23 Bottlebrush Avenue, Noosa Head. 22 May 2025 PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES RESPONSE AO3.2 Where the filling is for residential commercial or industrial purposes the works comply with Australian Standard - Guidelines for earthworks on commercial & residential development. Local amenity PO4 AO4.1 RO4 Earthworks do not cause disturbance to the The following control measures are Development will comply with the requirements amenity of the neighbouring land. implemented— of the Acceptable Outcome with regards to dust control and Earthworks operation hours a) regular water spraying of exposed areas to suppress dust; b) provision of dust stabilised or sealed internal roads c) protective covering of exposed areas that are left for more than 2 weeks; and d) if there is no valid development permit for the site, disturbed areas are revegetated using species identified in PSP3 - Landscaping Plants and Guidelines; AND https://mpncnetau.sharepoint.com/sites/administration/shared documents/10000-10999/10300-10399/10306/codes/22-05-25 earthworks code_issue a.docx Page 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Civil Engineering Report.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.