Civil Engineering Report
Original PDF page 69, section 1. The text section number identifies this passage in the reader.
EARTHWORKS CODE Performance Criteria and Acceptable Solution 23 Bottlebrush Avenue, Noosa Head. 22 May 2025 PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES RESPONSE Extent of earthworks PO8 AO8 RO8 Earthworks are contained within the subject All earthworks, including cut and fill batters, All earthworks and retaining are contained property. retaining walls etc. are contained within the within the development site subject site. Sloping sites PO9 AO9 RO9 On sloping sites, excavation or filling are Cut or fill is less than 2m in depth relative to the All cut and fill will be less than 2m in depth designed to maximise the use of natural slope natural ground surface. relative to the natural ground surface. and minimise the need for cut and fill. Environmental protection PO10 AO10 RO10 Earthworks minimise any adverse impact upon No solution provided. Earthworks will minimise impacts as required by groundwater, watercourses, drainage lines, performance criteria. wetlands, and native vegetation. https://mpncnetau.sharepoint.com/sites/administration/shared documents/10000-10999/10300-10399/10306/codes/22-05-25 earthworks code_issue a.docx Page 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Civil Engineering Report.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.