Original source · versioned page text
Civil Engineering Report
Original PDF page 68, section 1. The text section number identifies this passage in the reader.
EARTHWORKS CODE Performance Criteria and Acceptable Solution 23 Bottlebrush Avenue, Noosa Head. 22 May 2025 PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES RESPONSE Managing contamination risk PO6 AO6.1 RO6 Materials used as fill are suitable for The fill material is solid clean earth, free of All fill material used on site will be clean fill. development of the land and filling or putrescible or refuse material, vegetation, acid excavation works do not result in the sulfate soils, building or construction material contamination of land. or other material or contaminants; AND AO6.2 The site is not on the contaminated land register. Haulage activity and amenity PO7 AO7 RO7 Haulage of material to and from a site ensures— No solution provided Development will comply with the haulage requirements. a) minimal disturbance to neighbouring properties and properties along the haulage route; and b) Council’s road infrastructure including pavements is not adversely affected. https://mpncnetau.sharepoint.com/sites/administration/shared documents/10000-10999/10300-10399/10306/codes/22-05-25 earthworks code_issue a.docx Page 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Civil Engineering Report.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.