Original source · versioned page text
2021-11-15 General Committee Meeting Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
GENERAL COMMITTEE MEETING AGENDA 15 NOVEMBER 2021
v. After 10pm all doors/windows must be fully closed;
vi. The underside of all roof elements over outdoor dining areas
associated with the café use are to be lined with acoustic absorptive
lining minimum NRC 0.7;
vii. No dining is permitted outside the building.
viii. All amplified noise at the premises must be conducted through a sound
limiting device at all times to ensure that noise does not exceed the
following: during the daytime and evening (0600 to 2200) must not
exceed 92 dB(A) LWA, 90dB(A) LAeq, adj, T at 3 metres from the
speakers.
ix. Any live performer must be required to play through the in-house
system. No speakers (in addition to the in-house system) are permitted
on site.
b. Within 20 business days of the commencement of trading of the
restaurant/café use, Council must be provided with a Noise Management
Plan which is specific to the use and prepared on the basis of physical and
technical assessment of noise from the restaurant/café use, including both
internal and external use areas. The noise management plan must suitably
detail physical and management noise control measures.
c. The applicant must advise prospective purchasers that a Noise
Management Plan has been prepared to manage noise emissions related
to the development.
d. The Noise Management Plan referred to in Condition 83(b) shall be
incorporated in perpetuity in the By-Laws of the Body Corp for the whole
development.
e. The Noise Management Plan shall include a process for dealing with
complaints and specify that the Restaurant/Café Management and Body
Corp Manager be responsible for dealing with any noise complaints.
B. Add additional Condition 98 to read as follows:
98. On completion of the works associated with enclosing the restaurant outdoor dining
area certification from an appropriately qualified acoustic consultant must be
provided. The certification must confirm that the as-constructed built form achieves
the minimum 25 dB(A) noise reduction identified in the noise management plan
(Report No: R21055/D3295/Rev.0/25.08.21 prepared by David Moore & Associates
and dated 25 August 2021) and that all plant and equipment including the new air-
conditioning plant achieves compliance with the development approval noise limits.
C. Add additional Advisory Note 12
Additional ADVISORY NOTE – 21 October 2021
12. This Development Permit for a “Minor Change to an Existing Approval” reference
132005.1133.15 will trigger an “Infrastructure Charge Notice” to be issued in
accordance with Council’s “Charges Resolution” made pursuant to the Sustainable
Planning Act 2009 and in conjunction with the State Planning Regulatory Provision
(adopted charges).
The infrastructure charge relates to the Minor Change to Stage CTS 400 (Resort
Facilities) as follows:
Page 12 of 58
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.