14. Certification must be submitted to Council from all relevant service providers (Energex
and NBN) which certifies that the development has met the requirements of this Decision
Notice and all applicable legislation at the time of construction.
Easements
15. An easement for access purposes must be registered against the title of proposed Lot
11 in favour of proposed Lot 10. The easement must be:
a. located generally in accordance with the approved plan
b. a minimum width of 4.5m and/or of sufficient width to fully encompass the path of
a maintenance vehicle across the existing culvert and including the approaches on
either side of the culvert.
The terms of the easement must ensure that suitable access for proposed Lot 10 is
provided in the long term and place all maintenance responsibilities of the culvert
crossing, vehicle approaches and dam wall on the owner of Lot 11
16. Unless otherwise agreed in writing by the relevant service provider, any public or third
party infrastructure located on the subject site must be placed within an easement
registered against the title of the property.
17. All easements must be designed in accordance with the planning scheme and granted
at no cost to the Grantee. Where the Grantee is Council or a service authority, the
easement documentation must be in accordance with the Grantee’s standard easement
terms. Draft easement documentation must be submitted to Council for endorsement.
18. All works must be kept clear of any existing or proposed easements on the subject land,
unless agreed otherwise in writing by the Grantee.
Damage to Services and Assets
19. Any damage caused to existing services and assets as a result of the development works
must be repaired at no cost to the asset owner at the following times:
where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and
assets must first be referred to the relevant service authority for approval.
ENVIRONMENTAL MANAGEMENT
Land Rehabilitation
20. A vegetation protection covenant must be registered against the titles of both properties
over the proposed covenant area identified on the approved plans of development
pursuant to Section 97A of the Land Title Act 1994. The covenant document and a
survey plan must be submitted to Council for endorsement prior to lodgement with the
relevant titles authority for registration of title. The covenant document must:
a. Incorporate the requirements of this Decision Notice;
b. Include Noosa Council as Covenantee; and
c. Reference Queensland Land Title Registry Standard Terms Document No.
715597513.
Works within Protected Land
21. The following works must be undertaken within the covenant area in accordance with
Page 19 of 58
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.